Building Committee Presentation: JULY 17, 2012 PREFERRED SCHEMATIC STUDY AND REPORT

Building Committee Presentation: JULY 17, 2012 PREFERRED SCHEMATIC STUDY AND REPORT Hanson, MA | Whitman-Hanson Regional School District. Module 3 Preferred Schematic Study and Report CONTENTS. EVALUATION OF EXISTING CONDITIONS FINAL EVALUATION OF ALTERNATIVES

halil
Download Presentation

Building Committee Presentation: JULY 17, 2012 PREFERRED SCHEMATIC STUDY AND REPORT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Building Committee Presentation: JULY 17, 2012 PREFERRED SCHEMATIC STUDY AND REPORT Hanson, MA | Whitman-Hanson Regional School District

  2. Module 3 Preferred Schematic Study and Report CONTENTS • EVALUATION OF EXISTING CONDITIONS • FINAL EVALUATION OF ALTERNATIVES • SELECT PREFERRED OPTION • FINAL SUBMISSION REQUIREMENTS • NEXT STEPS MOVING FORWARD

  3. Module 3 Preferred Schematic Study and Report Evaluation of Existing Conditions Updates to Original Existing Conditions Report • Wetlands • Historical • Geotechnical

  4. Module 3 Preferred Schematic Study and Report Evaluation of Existing Conditions Updates to Original Existing Conditions Report

  5. Module 3 Preferred Schematic Study and Report Final Evaluation of Alternatives • Proposed Space Summaries • Options 4A & 4B: PK-2 New Construction Maquan School • Options 5: PK-5 Addition/ Renovation to Indian Head School • Options 6A & 6B: PK-5 New Construction Combined Maquan & Indian Head • Conceptual Plans- All Options • Option 4A: Site Plan, Floor Plans, & Phasing Plans • Option 4B: Site Plan, Floor Plans, & Phasing Plans • Option 5: Site Plan, Floor Plans, & Phasing Plans • Option 6A: Site Plan, Floor Plans, & Phasing Plans • Option 6B: Site Plan, Floor Plans, & Phasing Plans • Proposed Project Construction Schedule • Proposed Total Project Budget and Construction Cost Estimate

  6. Module 3 Preferred Schematic Study and Report 1. Proposed Space Summaries

  7. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4A| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School. Estimated Construction Costs: Total: $30,515,665 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  8. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Maquan Elementary School Feasibility Study Hanson, MA Option 4A| PK-2, New 2-Story on Maquan Site – Building Plans

  9. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing septic. NO WORK 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  10. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing septic. PHASE 2: Building & Site NO WORK 2 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  11. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4A| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing septic. PHASE 2: Building & Site NO WORK PHASE 3: Demo & Site 2 3 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  12. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4B| PK-2, New 2-Story School on Maquan Site – Site Plan Maquan PK-2: Enrollment: 395 A new 2-story school building on the Maquan site for Pre-K to grade 2. Demolition of existing Maquan School Estimated Construction Costs: Total: $31,201,959 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  13. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Maquan Elementary School Feasibility Study Hanson, MA Option 4B| PK-2, New 2-Story School on Maquan Site – Building Plans

  14. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. NO WORK 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  15. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. PHASE 2: Building & Site NO WORK 2 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  16. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 4B| PK-2, New 2-Story School on Maquan Site – Phasing Plan PHASE 1: Septic – Early bid package. PHASE 2: Building & Site NO WORK PHASE 3: Demo & Site 2 3 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  17. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Site Plan Combined PK-5: Enrollment: 800 Demolition of the Indian Head one story wing. New 2-story additions. Targeted renovation of the existing 2-story 1951 wing. Demolition or re-purposing of Maquan School Estimated Construction Costs: Total: $43, 841, 800 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  18. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Maquan Elementary School Feasibility Study Hanson, MA Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Building Plans

  19. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan PHASE 1: Addition; Serves as a 2 story swing space for Phase 2 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 1

  20. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan PHASE 1: Addition; Serves as a 2 story swing space for Phase 2 PHASE 2: Demo & Addition 2 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 1

  21. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan PHASE 1: Addition; Serves as a 2 story swing space for Phase 2 PHASE 2: Demo & Addition 2 PHASE 3A & 3B: Summer Renovations New Septic Field 3A 3B Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 1

  22. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition – Phasing Plan PHASE 1: Addition; Serves as a 2 story swing space for Phase 2 PHASE 2: Demo & Addition 2 PHASE 3A & 3B: Summer Renovations New Septic Field PHASE 4: Demo & Site 4 3A 3B Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District 1

  23. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6A| New 2-Story School on Indian Head Site – Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Indian Head site. Demolition or re-purposing of Maquan and Indian Head Schools Estimated Construction Costs: Total: $42,594,292 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  24. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Maquan Elementary School Feasibility Study Hanson, MA Option 6A| New 2-Story School on Indian Head Site – Building Plans

  25. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6A| New 2-Story School on Indian Head Site – Phasing Plan PHASE 1: Building , Septic, & Site 1 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  26. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6A| New 2-Story School on Indian Head Site – Phasing Plan PHASE 1: Building , Septic, & Site PHASE 2: Demo & Site 1 New Septic Field 2 Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  27. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6B| New 2-Story School on Maquan Site- Site Plan Combined PK-5: Enrollment: 800 A new 2-story building for Pre-K to grade 5 on the Maquan site. Demolition of Maquan School and demolition of re-purposing of Indian Head School Estimated Construction Costs: Total: $43,017,532 New Septic Field Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  28. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Maquan Elementary School Feasibility Study Hanson, MA Option 6B| New 2-Story School on Maquan Site – Building Plans

  29. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6B| New 2-Story School on Maquan Site- Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing. New Septic Field 1 Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  30. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6B| New 2-Story School on Maquan Site- Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing. PHASE 2: Building & Site 2 New Septic Field 1 Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  31. Module 3 Preferred Schematic Study and Report Conceptual Plans- All Options Option 6B| New 2-Story School on Maquan Site- Phasing Plan PHASE 1: Septic – Early bid package. Temporary tie in of existing. PHASE 2: Building & Site PHASE 3: Demo & Site 2 New Septic Field 3 1 Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  32. Module 3 Preferred Schematic Study and Report Project Construction Schedule Option 4A & 4B| PK-2, New 2-Story School on Maquan Site March 14, 2014 Early bid package June 20, 2014 Construction starts Dec. 21, 2014 Move into new bldg. April 25, 2014 Bidding starts May 3, 2016 Construction complete Jan 4, 2015 13 WEEKS 8 WEEKS PHASE 2 – 18 MONTHS 4 MONTHS PHASE 3 PHASE 1 PHASE 2 NEW SEPTIC SYSTEM BUILD NEW BUILDING + SITEWORK DEMO OLD BLDG + SITEWORK Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  33. Module 3 Preferred Schematic Study and Report Project Construction Schedule Option 5| PK-5, Renovation and Addition to Indian Head with Partial Demolition Nov. 21, 2016 Move into north addition April 25, 2014 Bidding starts June 20, 2014 Construction starts April 20, 2015 Move into south addition August 24, 2016 June 22, 2016 August 24, 2015 June 22, 2015 March 20, 2017 Construction complete 8 WEEKS 10 MONTHS PHASE 2 – 18 MONTHS 9 WEEKS 9 WEEKS 4 MONTHS PHASE 3A PHASE 3B RENO EXIST. INDIAN HEAD RENO EXIST. INDIAN HEAD PHASE 1 PHASE 4 PHASE 2 BUILD NEW ADDITION (SOUTH) DEMO MAQUAN DEMO 1960’S WING + BUILD SEPTIC SYSTEM + NEW ADDITION (NORTH) Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  34. Module 3 Preferred Schematic Study and Report Project Construction Schedule Option 6A| New 2-Story School on Indian Head Site Nov. 21, 2016 Construction complete April 25, 2014 Bidding starts June 20, 2014 Construction starts April 20, 2016 Move into new building 8 WEEKS PHASE 1 - 22 MONTHS PHASE 2 – 6 MONTHS PHASE 1 PHASE 2 NEW SEPTIC SYSTEM + BUILD NEW BUILDING DEMO OLD BLDGS. + SITEWORK Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  35. Module 3 Preferred Schematic Study and Report Project Construction Schedule Option 6B| New 2-Story School on Maquan Site March 14, 2014 Early bid package June 20, 2014 Construction starts April 20, 2016 Move into new bldg. April 25, 2014 Bidding starts Nov. 21, 2016 Construction complete 13 WEEKS 8 WEEKS PHASE 2 – 22 MONTHS 6 MONTHS PHASE 3 PHASE 2 PHASE 1 DEMO OLD BLDGS. + SITEWORK NEW SEPTIC SYSTEM BUILD NEW BUILDING + SITEWORK Maquan Elementary School Feasibility Study Hanson, MA Whitman-Hanson Regional School District

  36. Module 3 Preferred Schematic Study and Report Proposed Total Project Budget and Construction Cost Estimate OptionConstruction CostProject Cost 4A New school at Maquan $30,515,665 $38,144,581 PK-2 4B New school at Maquan $31,201,959 $39,002,449 PK-2 5 Add. Reno. Indian Head $43,841,800 $54,802,250 (partial demo) PK-5 6A New School at Indian Head $42,594,292 $53,242,865 or Maquan, PK-5 6B New School at Indian Head $43,071,532 $53,771,915 or Maquan, PK-5 Recommended Option

  37. Module 3 Preferred Schematic Study and Program Final Submission Requirements • Overview • Educational Program • Space Summary • Building Plans • LEED/CHPS Scorecard • Site Plans • Budget • Updated Project Schedule

  38. Module 3 Preferred Schematic Study and Report Next Steps Moving Forward • Target Dates • Vote Approval of Submission July 24, 2012 • Feasibility Submission to MSBA August 6, 2012 • Board Meeting & Proceed to Schematic Design October 3, 2012 • Schematic Design Submission to MSBA December 13, 2012 • Project Scope & Budget Meeting December 28, 2012 • Hanson Town Meeting May 8, 2013 • Ballot Vote May 18, 2013 • Bidding Starts April 25, 2014 • Construction Complete May 3, 2016 – • March 20, 2017

  39. Thank You