SelkirkParish Church(SC014883)PV project David Bethune
Stage 1: Initial proposal (2009) • sketches • congregational board • design • costs
Design: • 40 x 180Wp modules • Coverage 53.5 m2 • Capacity 7.2 kWp • Predicted annual output: 5,575 kWh • Cost £31K (+scaffolding, electrical connection) • predicted saving £2.5K per annum • payback time c12 years
inverter (in roof space) • direct connection to existing supply • generation meter (with display) • no moving parts = minimal maintenance
Stage 2: Permissions (2010) • congregational board • planning permission • listed building • general trustees
Stage 3: Funding (2010) £34K • LCBP2e 50% • E-on Source Fund • Scottish Power Green Energy Fund • EDF Green Fund
Stage 4: Decision (Dec 2010) • LCBP2e 50% • loan from General Trustees • £5,700 from own funds
Financially: heading towards c7000 Units per annum = £3530 from FiTs + £105 from export + ?£500 reduced bills = £4000+ per annum benefit
Environmentally: > 3 tonnes CO2 per annum less If all 2000 churches …. …. 6 kilo tonnes saving!
a success! • significant financial benefit • significant environmental benefit • a visual sign to our community • encouraging others • members houses • manses • community buildings
Thanks for listening! David Bethune david@dbethune.com 01750 21703