Highways & Engineering Savings & Efficiency review proposals 2011-14 Staff consultation. Peter Molyneux Assistant Director (July 2010). Drivers for change. Reduction in funding £2.523m reduction revenue funding £4.120m reduction in capital funding £0.336m reduction in income
E N D
Highways & EngineeringSavings & Efficiency review proposals 2011-14Staff consultation Peter Molyneux Assistant Director (July 2010)
Drivers for change • Reduction in funding • £2.523m reduction revenue funding • £4.120m reduction in capital funding • £0.336m reduction in income • £3.500 end of Transport Infrastructure Fund
Areas affected • Management, Administration and Supervision • Street Lighting • General Highway maintenance • Highway and Footway reconstruction programmes • Urgent repairs • Bridges and structures • Traffic management • Highway Drainage • Asset Management
Proposed changes * In addition to the above there are 8 vacancies to be deleted
Proposed timetable • Executive report approved – 28th June 2010 • Staff Briefing – 6th July 2010 • ‘At risk’ letters issued – 6th July 2010 • Detailed report approved – w/c 26th July 2010 • Staff Briefing on detailed proposals – 27th July 2010 • Formal Consultation period - July to September 2010 • Seek volunteers for voluntary severance or redundancy - July to September 2010 • Formal Approval to new structure – November 2010 • Redundancy selection and appointments – December 2010 to January 2011 • Implementation – February 2011