Highways & Engineering Savings & Efficiency review proposals 2011-14 Staff consultation

Highways & Engineering Savings & Efficiency review proposals 2011-14 Staff consultation. Peter Molyneux Assistant Director (July 2010). Drivers for change. Reduction in funding £2.523m reduction revenue funding £4.120m reduction in capital funding £0.336m reduction in income

Download Presentation

Highways & Engineering Savings & Efficiency review proposals 2011-14 Staff consultation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highways & EngineeringSavings & Efficiency review proposals 2011-14Staff consultation Peter Molyneux Assistant Director (July 2010)

  2. Drivers for change • Reduction in funding • £2.523m reduction revenue funding • £4.120m reduction in capital funding • £0.336m reduction in income • £3.500 end of Transport Infrastructure Fund

  3. Areas affected • Management, Administration and Supervision • Street Lighting • General Highway maintenance • Highway and Footway reconstruction programmes • Urgent repairs • Bridges and structures • Traffic management • Highway Drainage • Asset Management

  4. Proposed changes * In addition to the above there are 8 vacancies to be deleted

  5. Proposed changes

  6. Savings profile

  7. Proposed timetable • Executive report approved – 28th June 2010 • Staff Briefing – 6th July 2010 • ‘At risk’ letters issued – 6th July 2010 • Detailed report approved – w/c 26th July 2010 • Staff Briefing on detailed proposals – 27th July 2010 • Formal Consultation period - July to September 2010 • Seek volunteers for voluntary severance or redundancy - July to September 2010 • Formal Approval to new structure – November 2010 • Redundancy selection and appointments – December 2010 to January 2011 • Implementation – February 2011