Site-Wide Modeling for MSS Robert Opiela, Team Leader Air Dispersion Modeling Team TCEQ, Air Permits Division Austin, Texas October 16, 2007
Introduction • Define concepts • Clarify expectations • Provide examples
Applicability • MSS related projects • Flexible permits • Permits with operational flexibility
New Concepts • Activity • Facility emissions authorized for specific activity • Activity not associated with a facility • Emissions of same pollutant from all activities are evaluated
Not So New Concept (1) • Modeling scenario • Representation of activities from a single source • Examples • Load analyses for EGU • Tank working losses and breathing losses • Short-term analysis separate from annual
Implementation in Modeling • Demonstrating worst-case scenario • Represent all applicable operating scenarios (production and MSS activities) • Key representations included in permit conditions
Not So New Concept (2) • Generic modeling • Model each source/source group at 1 lb/hr • Report results (µg/m3 per lb/hr) for each source/source group • Use ONE model input file, please
Implementation in Modeling • Determining culpable sources • Provides information on source(s) driving worst-case scenario • Allows focus on limited number of sources • Determines site baseline concentrations
Not So New Concept (3) • Emission rate to ESL ratio (E/ESL) • Evaluate site-wide or • Sum source by source for all sources
Implementation in Modeling • Determining limiting pollutant • If this pollutant acceptable, all pollutants acceptable • Determining limiting emission rates • Demonstrates pollutant emission rate by source that would be acceptable
Not So New Concept (4) • Continuous Activity • Theoretically could operate 8760 hours/year but practically could not • Operates from hour-to-hour for many hours/year during any 8760 hours/year • Operates from hour-to-hour for many hours/year on a certain schedule
Not So New Concept (5) • Batch Activities • Activity starts and finishes within a few hours • Significant time between activities • Limited number of activities per year
Expectations • Document all steps in your analysis • Substantiate all claims and representations • Provide technical justifications for all assumptions and selections
Example (1) • Continuous production and one MSS activity • Is MSS activity separate source from all production sources? • In either case, all emissions considered in annual analysis
Example (1) Implementation • Case of MSS simultaneous with production • Model production as one source group • Model MSS activity as one source group • Model using ALL group
Example (1) Implementation • Case of MSS not simultaneous with all production • Model all production activities as one scenario • Model MSS and simultaneous production sources as separate groups in 2nd scenario • Could model MSS and all production together as a short-cut, only if below threshold
Example (1) Implementation • Analyzing exceedances in either case • Consider production and MSS hours of operation separately to adjust number of exceedances • Could consider only production hours of operation as a short-cut
Example (1) Implementation • Annual concentrations • Model production as one source group • Model MSS as one source group at maximum hour emission rate • Add the production concentrations to N/8760 times the sum of the N highest MSS predicted concentrations; N is MSS hours
Example (1) Implementation • Annual concentrations short-cuts • Add N/8760 times MSS GLCmax to production GLCmax, or • Add MSS GLCmax to production GLCmax
Example (2) • Continuous and batch production activities and multiple MSS activities • Much more complicated, but don’t make more complicated than you need to • Recommend you submit a detailed modeling protocol; coordinate with us FIRST before you start modeling
Example (2) Implementation • Helpful hints • Follow general ADMT guidance; pre-coordinate deviations from general guidance • Be ready to perform generic modeling of ALL sources • Use MAXIFILE option with source groups
Example (2) Implementation • First conduct generic modeling • Use 1 lb/hr for each source/source group • Use 1 model input file • Use 1 PLOTFILE • Use 1 averaging time (1-hour or annual)
Example (2) Implementation • Import PLOTFILE into a spreadsheet • Select fixed record length option • Parse the columns properly • Start on first row of data, skip the header • Sort data in spreadsheet • Sort by source group, x, y • Delete all header lines
Example (2) Implementation • Import spreadsheet into database program • Create a table of the spreadsheet data • Run query to reformat data • Export query results into another spreadsheet • Results are the unit concentrations
Example (2) Implementation • Determine maximum unit concentrations • Use MAX function for each source group • Determine worst case source • Can apply E/ESL for that source, maybe • Can use for generic method 1 • If you pass, you’re done
Example (2) Implementation • Determine worst case scenario • Provide data from generic modeling • Analyze data from generic modeling • Specify the operational conditions • Propose physical or operational limits
Example (2) Implementation • Refine with generic method 2 • Create worksheet with emission rates • List pollutant • List ESL • List emission rate by source group
Example (2) Implementation • Refine with generic method 2 • Apply unit concentration to E/ESL • For each source group • Sum contributions from all source groups • Determine the maximum • Results are in multiples of the ESL
Example (2) Implementation • Further Refinement • Pollutant specific modeling • Use the MAXIFILE option • For the ALL source group • For culpable source groups • Use an appropriate threshold
Example (2) Implementation • Further Refinement • Adjusting hours of exceedance • Consider hours of culpable sources • If hours fewer than hours of exceedances • Scale based on hours if operating hours are frequent • Consider operation schedule • Daytime only or nighttime only • Hours between activities
Summary • Be clear on concepts discussed earlier • Ask questions if you are unclear or unsure • Follow ADMT guidance • Document everything you did • Minimize the modeling and modeling files