60 likes | 303 Views
MSS Work Management. Overview of TDS methods and integration case study Chad Anauo TDS Telecom. Background. 346 active Provisioning Plans Down from over 2000 231 active Rules and Behaviors Fewer Plans – more R&B Approx. 3,000 Field Dispatches per Month. Ventyx Background.
E N D
MSS Work Management Overview of TDS methods and integration case study Chad Anauo TDS Telecom
Background • 346 active Provisioning Plans • Down from over 2000 • 231 active Rules and Behaviors • Fewer Plans – more R&B • Approx. 3,000 Field Dispatches per Month
Ventyx Background • Dispatch and fleet management • Appointment booking • Drive times • Availability • Estimated job time
Basic Integration overview • Sub Area definitions • CLLI logic • Better alternatives • Task status “event” driven • Task Status • Supplements • Potentially late intervals
Basic Integration overview • Work Order Generation • Task Sync • Job code mapping • Product Catalog • Network Templates
Integration Design • System Interdependancies v4[1]_vsd.htm • Determine Appointment Window Flow.vsd