Levee Certification Status in FEMA Region VI

Levee Certification Status in FEMA Region VI. USACE Red River Levee Meeting Texarkana, Arkansas SW Arkansas Electric CO-OP January 30, 2009 Guy Lowes, P.E., FEMA Region VI. Outline – Levee Accreditation FEMA Region 6. Presentation Outline. Federal Accreditation Regulations

hani
Download Presentation

Levee Certification Status in FEMA Region VI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Levee Certification Status in FEMA Region VI USACE Red River Levee Meeting Texarkana, Arkansas SW Arkansas Electric CO-OP January 30, 2009 Guy Lowes, P.E., FEMA Region VI

  2. Outline – Levee Accreditation FEMA Region 6 Presentation Outline • Federal Accreditation Regulations • Responsibilities • Mapping & Certification Status in FEMA Region VI • FEMA Region 6/ USACE Vicksburg District Study Details • Questions

  3. Regulations – Levee Accreditation • Levee Accreditation Regulations • Interim Levee Policy (February 10, 1981) • 44CFR65.10 (August 25, 1986) • Integrating Levee Certification into the Map Modernization Program is new. • Procedure Memorandum 34 (August 22, 2005) • Interim Guidance for Studies Including Levees • Procedure Memorandum 43 (September 25, 2006) • Revised Procedure Memorandum 43 (March 16, 2007) • Guidelines for Identifying Provisionally Accredited Levees

  4. FEMA Responsibilities FEMA is responsible for the following: • Establishing/reflecting appropriate risk zone determinations on flood maps • Accredit levees that meet the criteria of 44CFR65.10 as providing protection from the 1% annual chance flood based on the certification provided by levee owner • Not accredit levees as providing protection that are not or cannot be shown to meet criteria of 44CFR65.10 • Establishing mapping standards

  5. Responsibilities of Others FEMA is not responsible for any of the following: • CERTIFYING LEVEES • Designing, constructing, operating, or maintaining levee systems • Examining levees • Determining how a structure or system will perform in a flood event

  6. Mapping Schedule by FY Start

  7. FEMA MOD Study Starts

  8. FEMA Levee Studies With Certification Issues

  9. FEMA Study Status

  10. FEMA Hempstead Levee Map