The Cabrio Stadium in Limassol

The Cabrio Stadium in Limassol. Tepakiani Construction Ltd Kyproulla Liassidou Melina Kombou Irene Kleanthous Christodoulos Giagkou Evis Hendi. Purpose. To attract tourists The existed stadium (Tsirio) is very old, unsafe and it is located in a built area

hao
Download Presentation

The Cabrio Stadium in Limassol

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Cabrio Stadium in Limassol Tepakiani Construction Ltd Kyproulla Liassidou Melina Kombou Irene Kleanthous Christodoulos Giagkou Evis Hendi

  2. Purpose • To attract tourists • The existed stadium (Tsirio) is very old, unsafe and it is located in a built area • To host big events like Olympic games, worldwide competitions etc

  3. Special Features • Area of the stadium is 3Km² • 30000 seats • 1000 V.I.P seats • Movable roof • Underground parking place for 7000

  4. Other Features • 16 toilets in the area of the seats • Press room • Locker rooms • 8 kiosks • Special designed places for disable people

  5. Materials • Steel (columns) • Fiberglass (seats) • Concrete (walls, columns, floor) • Glass • Wood (design)

  6. Equipment • Screens • Loud speakers • Headlamps • Photovoltaic system • Auto-irrigation system for the grass • Rain water collecting system

  7. Movable roof • Consists of two enormous shells • Takes place hydraulically • Made of steel and glass • Dome-shaped

  8. Opened roof

  9. Closed roof

  10. Safety • Emergency exits • Fire extinguishers • Alarm system • Detector of explosive materials and mental objects • Emergency room for first aid

  11. Cost: 43 million euro • Time line: 1 year • Staff: 200 workers

  12. Thank you