System Test 2002. Design verification of petals and interconnect boards and control links without detectors mechanics electrical performance thermal behavior Test of the IInd detector group (rings #3, #4, #6) ring #6 full equipped with Si-Modules ,and optical hybrids
E N D
System Test 2002 • Design verification of petals and interconnect boards and control links without detectors • mechanics • electrical performance • thermal behavior • Test of the IInd detector group (rings #3, #4, #6) • ring #6 full equipped with Si-Modules ,and optical hybrids • ring #3 and #4 ‚ equipped with detector frames, frontend hybrids and • optical hybrids only • Test of the IIIrd detector group (rings #5, #7) • equipped with detector frames , frontend hybrids and optical hybrids only • Test of the Ist detector group (rings #1, #2) • equipped with detector frames , frontend hybrids and optical hybrids only
Mechanics • mechanical compatibility of the InterConnect Boards (ICB) with the mechanical structure of petals • fixation points, inserts and holes for alignment system • position of the FE hybrid connectors vs. position of the detector modules, mech. stress of the Detector Module • fixation of the optical hybrids and routing of the fibers • mechanical stress of the ICB, cable connectors, ends of multiservice cables • due to the plugging and unplugging of multiservice cables • due to current flow in magnetic field, if the petals are tilted a little bit • dynamic stress on the non twisted cable ends due to switching on and off of groups of FE Hybrids, • due to the large thermal expansion coefficient of pcb material and large difference in two operating conditions –30 °C and room temperature
Equipment: • Magnetic field, B 1Tesla (Bonn or CERN) • Switchable dummy load of Frontend Hybrid • dummy load of Optical Hybrid • Thermo – Vacuum chamber
Electrical performance • Quality of production • continuity of connections, • insulation test of HV-distribution • test system for mass production of assembled ICB • Power distribution • voltage drops; verification of x-section of power lines • verification of points of attachment of sense wires and ground reference • measurement of the over-voltage (due to switching off/on of the FE hybrids and inductance of the long cables) as a function of capacitive load, protection against over-voltage? • location of the capacitors on the ICB, total capacitance on the ICB
Electrical performance (cont.) Signal Integrity of the distribution of the fast control signals: clock, reset and back plane pulses
Connection Test System Technical data Test points: 64 - 4096 Low voltage: 0,1 - 40VDC Insulation test: 50 - 1500 VDC Test current: 50 mA - 2 A Selective component test Resistors Capacitors Diodes / Zener diodes Costs: Frame : 12 000 € 64 test points module: 500 € total for 2048 test points: 28 000 €
Connection Test System based on CCUM • Dummy of FE - Hybrid eqipped with I2C controlled 16 BIT I/O port • and a little logic to test the voltage level on each pin of connector • Dummy of OH with a little logic to test the voltage level on each pin of connector
Tools for the test of power distribution and Signal Integrity • „Emulator“ of the CCUM with the basic functions
Tools for the test of power distribution (cont.) • Switch-able dummy load of Front-end Hybrid • dummy load of Optical Hybrid • both with the proper dynamic resistivity of the power ports Schematics of the dummy
Control link and control optoelectronics on the level of petals • mechanical verification of the control ring • fixation of the digital optical hybrids (DOH), fixation of the CCUMs • cable routing • Cooling of the DOH module • verification of the electrical performance of control ring • impedance matching, termination, reflections • shielding of cables, shielding of DOHs • voltage margin, cross section of power lines and GND lines • verification of grounding concept, bit error rate • verification of redundancy of control link
Tools for Tests of Control link • 1 stage • CCUM 2 pc/petal, • FEC 1 pc • Front-end hybrids or few • dummies with I2C I/O Port 4-11 pc • 2 stage • 1 control link 6 CCUMs (3) • ICB for IInd group 3pc • Inter-petal cables 3 pc • FEC 1 pc • dummies with I2C I/O Port 12-33 pc • 3 stage • Optical link 1 pc • Digital Optical Hybrid 2 pc/control link • ICB for IInd group 3pc • Inter-petal cables 3 pc • dummies with I2C I/O Port12-33 pc
Noise studies with Si-Detectors of II detector group • Pick up from digital signals • Ground loops, grounding of frames • Noise from cooling system if any? • Studies of shielding requirements of petals • Influence of ripples on the supply voltage to the quality of APV readout • Common mode effects at the level of power groups ; can noise from crazy chips feed through the power lines to other chips.
Required readout electronics Services LV – Power Supplies : HP E3633A + HP E3614A HV – Biasing: EHQ 8006F, 8 isolated channels, 600V, noise =2 mVpp, I resolution =100pA Temp Control: Keithley 2700 DAQ