1 / 8

Task Group 10 (Proppants)

Standard testing methods for sand, ceramic media, resin-coated proppants etc. used in hydraulic fracturing and gravel-packing operations, including physical and long-term conductivity testing.

harryt
Download Presentation

Task Group 10 (Proppants)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task Group 10(Proppants) Ron Powell 24 January 2018 San Antonio, Texas

  2. TG-10 Charge • Provide standard testing procedures for evaluating proppants used in hydraulic fracturing and gravel-packing operations. • “Proppants” - sand, ceramic media, resin-coated proppants, etc. • Provide consistent methodology for testing performed on hydraulic fracturing and/or gravel-packing proppants.

  3. TG 10 Update • Current Structure: • Two Work Groups (3rd pending) • WG-1 – Physical Properties Testing • WG-2 – Long-term Conductivity Testing • Study Group 3 - Unconfined Compressive Testing Procedure (coated proppants testing)

  4. TG 10 Update • Last TG-10 Meeting: 26 July 2017 • WG-1 Updating 19C • WG-2 Updating • Unconfined Compressive Testing Procedure • Pending as Work Group 3 (SR3 must be submitted) • Committee Chair: Naima Spurr (Baker Hughes) • Naima has new position • Meetings on Hold • (Scope to be defined; SR3 not ready)

  5. WG-1 (Schilling, Jackson) • Physical Properties Testing (19C) • Last Meeting: 26 July 2017 • Next Meeting: 14 February 2018 • Steve Schilling, John Jackson – Co-chairs • Small Group Completed Final Revision of 19C • Submitted for Balloting • Ballot Closes 26 January 2018

  6. WG-1 Update • API Standard 19C – In Balloting • Comment Resolution • Before 14 February Meeting • Overview of 19C Standard • Discussion of Current Draft

  7. WG-2 (Golashchapova) • Long-term Conductivity Testing (19D) • Last Meeting: 26 July 2017 • Small Group Reviewing 19D Draft • Next Meeting: 14 February 2018 • Committee Chair: • Dina Golashchapova (Schlumberger)

  8. TG-10 Summary • WG-1 (Standard 19C) • In Balloting (Closing 26 Jan) • Group Making Good Progress • WG-2 (RP 19D) • Update to RP 19D in Progress • Small Working Group Holding Regular Meetings • UCS Study Group • On Hold • One co-chair resigned • Next TG10 Meeting: 14 February 2018

More Related