1 / 7

PCR Status Date: 5 December 2012

PCR Status Date: 5 December 2012. Content. Achievements Revised planning outlook Reasons for delays Remaining risks. Achievements. Algorithm release 3 delivered and in test Release 4 foreseen for last bug fixing on release 3

harsha
Download Presentation

PCR Status Date: 5 December 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PCR StatusDate: 5 December 2012

  2. Content • Achievements • Revised planning outlook • Reasons for delays • Remainingrisks

  3. Achievements • Algorithm release 3 delivered and in test • Release 4 foreseen for last bug fixing on release 3 • PCR Matcher Broker (PBM) software Release 2 getting stable • Release 3 expected for someadditional plugins • Procedures: • Draft versions available – some issues identifiedon timings • Alignment discussions between PCR and NWE on timings are currentlyongoing • Testing infrastructure installed: • Algorithmintegrated in PBM • PMB beingintegrated in local tradingsystems • ConnectivitybetweendifferentPMBsatdifferentPXsestablished • Sanity tests are starting ( check of file formats and exchange etc…) as preparation for the 5 PX integration tests • Test scenario’s are prepared

  4. Current Planning Outlook • Base case planning: • Handover of PMB release 2.X.X + Algorithm release 4 by end of April 2013 • Handover of PMB release 3 + Algorithm release 4 by end of May 2013 • This base case planning includes the change request for flow calculation but not the change request for LT nomination intorampingconstraints • Budget consequences are currentlyunder investigation

  5. Reasons for delays • Difficulties to agree on final specs • Severalrequests for changes fromPXs and TSOs • Software quality issues in first releases of algorithm and PMB leading to delays in the tests and extra bug fixing work • Difficultiesinstalling local test environments

  6. RemainingRisks • Unexpectedtesting issues in algorithm release 3 • Unexpectedtesting issues in the PMB releases 2.X.X and 3 • Change of currentlyspecified flow calculationmethodafter simulations • Overalldelay( increase in the variable projectcosts)

  7. Membership and otherrequests • OTE requested full membership: • Preparationstarted in PCR • Discussion to startbetween PCR and OTE • LAGIE, greekmarketoperator, signedconfidentialitydeclaration for associatemembership • Otherassociatemembersalsorequesting information on costreinvoicing • CEE TSOsrequested for assessment about algorithm compatibility with CEE  Important not to disturbcurrent PCR progress

More Related