Readiness Liaison Update. Erin Jester September 26, 2013. Contents. Readiness Metrics Readiness Metrics Inventory Edits to Readiness Metrics Parallel Operations Go/No-Go Updates Update on MP Self-Certification. Readiness Metrics Updates.
E N D
Readiness Liaison Update Erin Jester September 26, 2013
Contents • Readiness Metrics • Readiness Metrics Inventory • Edits to Readiness Metrics • Parallel Operations Go/No-Go Updates • Update on MP Self-Certification
Readiness Metrics Updates • Readiness Metrics Inventory is posted in the Readiness workstream folder • List of metrics, with high level info (e.g. if it is currently tracking, target completion date, etc.) • Two tabs: • External FERC Metrics • External Non-metrics reporting
Readiness Metrics Updates (Cont.) Clean and redline version of Readiness Metrics is posted in the Readiness workstream folder • New Readiness Metrics • OPS-05a, OPS-05b, OPS-05c, OPS-14, OPS-15, OPS-16, OPS-17, OPS-18, STL-07, TCR-06 • Edited Readiness Metrics • TRL-01, TRL-03, OPS-06a, OPS-06b, OPS-06c, OPS-12
Parallel Ops Go/No-Go Criteria Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. No change to the following criteria:
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center.
Parallel Ops Go/No-Go Criteria (Cont.) Draft Parallel Ops Go/No-Go Criteria are posted in the Go/No-Go folder on the Readiness Center. Two new criteria: