1 / 10

Field-to-Finish

Field-to-Finish. Field Coding Survey Data The Carlson Advantage One Solution for the Field and Office Carlson SurvCE 2.0 Carlson Survey 2008 Attendees for Sound Call : (605) 772-3434, access code 229-500-500 . What is our Field-to-Finish program?

haruki
Download Presentation

Field-to-Finish

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Field-to-Finish Field Coding Survey Data The Carlson Advantage One Solution for the Field and Office Carlson SurvCE 2.0Carlson Survey 2008 Attendees for Sound Call: (605) 772-3434, access code 229-500-500

  2. What is our Field-to-Finish program? • The Carlson Survey 2008 Field-to-Finish program has a user defined code table that controls how field surveyed points with these codes or descriptions will draw in CAD as connected line work and symbols in pre-defined layers. Carlson Survey 2008 - Field-to-Finish

  3. Setup your Office CAD Standards with Field to Finish • Field Codes Define e.g. BLD, BC, FH, UP, … • Layers for: • 2DPolylines Layer (zero elevation) • 3DPolylines Layer (at their true elevation) • Both 2D & 3DPolylines Drawn in Separate Layers • Symbols and their Layers • Point Labels and their Layers Create multiple Field-Code-Tables for each customers CAD Standards Carlson Survey 2008 - Field-to-Finish

  4. The Field-to-Finish Code Table • Code Definition Carlson Survey 2008 - Field-to-Finish

  5. Upload Carlson Survey 2008 Field Code Table (FLD file) to Carlson SurvCE 2.0 • FLD file uploaded into Carlson SurvCE 2.0 is renamed to a FLC file without symbol definition Carlson Survey 2008 - Field-to-Finish

  6. Drawing Linework (Lines & Curves) • No Start or End Special Code needed e.g. EP1, EP2, EP3… • Using Start or End Special Code +7, -7 • Creating Aliases for Start or End Special Code e.g. B, E • Start and End Curves Special Codes PC and PT • SurvCE Line & Curve Special Codes - Aliases e.g. B, E and for DOT’s Carlson Survey 2008 - Field-to-Finish

  7. Additional Special Codes • In PC Office Code Table • RECT (Rectangle) • JPN (Join to point number) • SMO (Smooth) • CLO (Close Polyline) • OH & OV (Offset H/V) • JOG (Add L/R H Offsets) • ROT & SZ • AZ & DIST • 2ND & 3RD • / (Add Note to Point Desc) • In SurvCE FLC Codes • RECT (2 or 3 Point) • JPN • SMO • CLO • OH & OV • / (Add Note) Carlson Survey 2008 - Field-to-Finish

  8. Plotting Point Labels & Point Groups • Setting • Distinct Point Layer • / Add Point Notes • Use Raw Desc • Type of Entity • Attribute Block • Dtext or Mtext • Point Groups • On Real Z • Significant Decimal • Attribute Layout ID Carlson Survey 2008 - Field-to-Finish

  9. Field-to-Finish Inspector Edits both descriptions in the CRD & RW5 files Carlson Survey 2008 - Field-to-Finish

  10. Carlson Survey 2008 Pricing • Autocad Inside or Inside Autocad Maysville Corporate Office 800-989-5028 Carlson Survey 2008 - Field-to-Finish

More Related