An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FP7-FissionLUCOEXLarge Underground ConceptEXperiments2011 - 2014Project ProgressMeeting14th May 2014WP5Problemhandlingtools for bufferinstallation in KBS-3V Keijo Haapala

  2. LOT3: Problem handling tools. • What is neededif the bentoniteblockfalls to the deposition holeduringthe installation? • The brokenblocksmustbetakenquickly out from the hole. • The weight of the blocksarefrom1.8 to 3.5 tons. Haapala Keijo

  3. LOT3: Problem handling tools. • The workcanbedevided in twoparts. • Beforecanisterinstallation • Aftercanister • Big partscanbeliftedbyvacuumgriper. Haapala Keijo

  4. LOT3: Problemhandlingtools. • Beforecanister • Repairingworkby ”A man in the hole”. • Lifting and cleaningbufferparts out from the hole • Somefixingaccessorieshasbeentested • Nylon FramePlug • Throughbolts. Haapala Keijo

  5. TESTING OF FIXING TOOLS • Testing of tension and shearforce of differentfixingaccessories in bentoniteblockshastested in Tampere university. • Testblocksused in the tests • Material MX-80 • L x W x H: 400 x 300 x 250 mm3 • Isostaticallypressed43 MPa, drydensity 1742 kg/m3 Haapala Keijo

  6. TESTING OF TROUGH BOLT (1) • FBN 8/50, D8 – 85/111 MM, AXIAL FORCE Haapala Keijo

  7. TESTING OF TROUGH BOLT (1) • FBN 8/50, D8 – 85/111 MM, SHEAR FORCE Haapala Keijo

  8. TESTING OF TROUGH BOLT (2) • D10 – 75/92 MM, AXIAL FORCE Haapala Keijo

  9. TESTING OF TROUGH BOLT (3) • PFG 8/85 (12.5 - 65 MM) AXIAL FORCE Haapala Keijo

  10. TESTING OF TROUGH BOLT (3) • PFG D8 – 85 (12.5 - 65 MM) SHEAR FORCE Haapala Keijo

  11. TESTING OF PLASTIC PLUG (4) • Plasticplug HD82 – 7/105 (9 – 85 MM) AXIAL FORCE Haapala Keijo

  12. TESTING OF PLASTIC PLUG (4) • Plasticplug HD82 – 7/105 (9 – 85 MM) SHEAR FORCE Haapala Keijo

  13. TESTING OF HEAVY TROUGH BOLT (5) • PGF D12 – 112 MM (11 - 98 MM) AXIAL FORCE Haapala Keijo

  14. TESTING OF HEAVY TROUGH BOLT (5) • PGF D12 – 112 MM (11 - 98 MM) SHEAR FORCE Haapala Keijo

  15. LOT3: Problem handling tools. • Aftercanister • Repairingworkby ”No one in the hole” because of radiation. • Possible to useremotely the sametools as ”BeforeCanister” situation • Demonstrationswillbedonemanually. Haapala Keijo

  16. LOT3: Problem handling tools. • Aftercanister • Ifit is needed to clear out the holebuffer, and becarefullwithcoppercanister?-> Water jet cutting. Haapala Keijo

  17. WATER JET CUTTING TOOL Haapala Keijo

  18. WATER JET CUTTING TOOL Haapala Keijo

  19. Haapala Keijo