150 likes | 298 Views
Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder 400 163 208. Louis Kahn - Research. Many of his buildings, particularly his most famous are of a large scale and contain an element of Monumentality.
E N D
Construction and Structures2 SRT 251 Major Project Warehouse and Office Complex Scenario Louis Kahn Christopher Holder 400 163 208
Louis Kahn - Research Many of his buildings, particularly his most famous are of a large scale and contain an element of Monumentality Louis Kahn used predominantly geometric forms, particularly in the openings. Brick and concrete are the main materials in which Kahn worked. Roofs appear flat and even hidden.
Proposed Site Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Design Technology • Specifications and Capabilities • - Roof beam pitch 7 degrees 7 minutes (i.e. 1 in 8) • - Span Clear span capabilities are available up to 40m approx. • - Bay width 6.0m is a recommended economic spacing of frames. • Eaves height 3.0 to 13.0 approx • Fire Resistance of 1-4 hours • - Cladding is variable from block work to metal sheeting Concast – The G-Frame is a precast concrete structural frame which works similarly to a Steel Portal Frame structure. Longitudinal support is be gained through the use of steel purlins or gurts. Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208 All information found at www.concast.ie
Concast G-frame Benefits -Larger span capabilities, allowing increased design flexibility. -Competitive pricing -Hygiene - ledges where dust and dirt collects can be minimised, which is ideal for high precision industries (such as pharmaceutical, computer or food processing facilities). -Inbuilt fire ratings avoid additional board or sprayed protection. -Factory production, quality checks prior to arriving on site. -Speed of erection. -Decreased maintenance costs – the frame is virtually maintenance free. -Clean finish. -Overhead gantry cranes – supports for overhead gantries can be provided in columns if requested at design stage. All information found at www.concast.ie
Construction Sequence Footings Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Structural System Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Roofing Purlins and Gurts Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Safety and Drainage Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Roof coverings Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208 Walls
Flooring and Windows Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Flashing Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208
Final Product Construction and Structures 2 SRT 251 Major Project Warehouse and Office Complex Scenario Christopher Holder 400 163 208