110 likes | 320 Views
Projet de synthèse en génie logiciel LOG 790 Claude Y. Laporte et Denis Roy. Références. Obligatoire Futrell, R. T., et al. ‘Quality Software Project Management’, Prentice Hall, 2002. Matériel supplémentaire Sur le site WEB de l’ETS. Étape 1. Sujet: Project Charter Definition Lecture:
E N D
Projet de synthèse en génie logicielLOG 790Claude Y. Laporteet Denis Roy
Références • Obligatoire • Futrell, R. T., et al. ‘Quality Software Project Management’, Prentice Hall, 2002. • Matériel supplémentaire • Sur le site WEB de l’ETS
Étape 1 Sujet: Project Charter Definition Lecture: • Appendix C - Creating the Business Plan • Appendix D - Understanding Systems Engineering • Chapter 32 – Legal Issues in Software (facultatif) • Chapter 7 – Defining the Goal and Scope of the Software Project Livrable: Contractual Agreement
Étape 2 Sujet: Project Management Plan, Life Cycle, Standards and Environment Lecture: • Chapter 3 – Process Overview • Chapter 4 – Selecting Software Development Life Cycles • Chapter 5 – Managing Domain Processes (facultatif) • Chapter 6 – Selecting a Project Team (facultatif) • Chapter 13 – Choosing and Organizational Form (facultatif) • Chapter 30 – Software Quality Assurance • Chapter 31 – Software Configuration Management • Chapter 22 – Analysis and Design Methods (facultatif) • Chapter 24 – Use of Tools (facultatif) Livrable: Project Management Plan
Étape 3 Sujet: Requirements Elicitation & Specifications Lecture: • Chapter 16 – Eliciting Requirements • Chapter 17 – Developing the Software Requirements Specification Livrable: Requirements Specification – Traceability and Verification Management Document
Étape 4 Sujet: Work Breakdown Structure Definition Lecture: • Chapter 8 – Creating the Work Breakdown Structure • Chapter 9 – Identifying the tasks and Activities Livrable: Work Breakdown Structure – Deliverables and Activities
Étape 5 Sujet: Software Estimation including Risks Lecture: • Chapter 10 – Software Size and Reuse Estimates (facultatif) • Chapter 11 – Estimation Duration and Costs • Chapter 18 – Determining project Risks • Chapter 20 - Reliability (facultatif) Livrable: Software Estimates – Justifications and Identified Risks
Étape 6 Sujet: Planning & Scheduling Lecture: • Chapter 12 – Assigning Resources (facultatif) • Chapter 15 – Scheduling the Work Livrable: Project Schedule, Tasks and Effort with Allocated Resources
Étape 7 Sujet: Tracking & Oversight Lecture: • Chapter 21 – Software Metrics (facultatif) • Chapter 25 – Project tracking and Control • Chapter 29 – Reporting and Communicating Livrable: Progress Indicator Mechanism – BCWP BCWS ACWP ACWS CR SPI CPI Defects Reports – Changes and Problems
Étape 8 Sujet: Technical Project Development (reviews and reports) Lecture: • Chapter 23 – Validation and Verification Livrable: Reviews and Progress Reports
Étape 9 Sujet: Post Mortem Lecture: • Chapter 28 – Post-Performance Analysis Livrable: Evaluation Report