Property Surveys

Property Surveys. Best done by an RLS State laws Legal liability Purpose - leave easily located corners Never done by Contractor. Property Surveys. Within boundary Set-backs Easements Rights-of-way Covenants Ask about title insurance. Auxiliary Baseline. Baseline.

heller
Download Presentation

Property Surveys

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Property Surveys • Best done by an RLS • State laws • Legal liability • Purpose - leave easily located corners • Never done by Contractor

  2. Property Surveys • Within boundary • Set-backs • Easements • Rights-of-way • Covenants • Ask about title insurance

  3. Auxiliary Baseline Baseline • Line parallel to construction • Out of harm’s way • Often use Property Line • Auxiliary Baseline • Through site • Set permanent endpoints • Reset interior points as needed • Typically 90° from baseline

  4. Batter Boards • Provide reference to building corners • 2x4 Uprights • 1x4 Ledger Board • Set level at known elevation • Nail on top defines line

  5. Building Corner Batter Boards • Pencil line or saw kerf marks line • String intersection marks critical points • Ledger board elevation ties to critical construction elevations

  6. B.S. = 5.65’ F.S. = 6.24’ Ledger board to be set at FF + 16’ = 223.50” Benchmark = 220.31’ Setting Ledger Boards HI = 220.31+5.65 = 225.96 Mark LB at (225.96 - 223.50) = 2.46’ below HI Mark stake at (6.24 - 2.46) = 3.78’ above ground Finish Floor Elev = 207.50’

  7. Radiation • All points referenced from baseline • Staking Plan • Converts coordinates to angle and distance • Built in to Total Station

  8. Radiation

  9. Pipeline Staking • Centerline - lath at regular intervals • Offset - Hub and grade stake at regular intervals

  10. Offsets • Reference points set back from harm’s way • Contractor typically decides based on: • Depth of cut • Back-slope angle • Trench box? • Time cut is open

  11. Grade Stakes • Mark offsets • 2x2 hub • Set back at offset • Top elevation set or known • Grade stake defines position • Gravity sewers: constant slope • Show cut to pipe invert

  12. Highway Staking • Preliminary Route • Centerline and R-O-W • Cross-sectioning • Construction Grade Staking • Blue Tops • As-built

  13. Preliminary Route Survey • Sets rough centerline • No curves – straight intersections • Centerline profile • Estimate cut and fill • Locate R/W needs

  14. Centerline/ROW Staking • Define stationing • ROW marks limits of access • All construction/material inside ROW • Width varies along route • Add horizontal curves • Staking: • Hub/lath every station at RW • Lath every station at CL • Shoot elevations on hubs

  15. Cross-sections • Determine existing grade • Centerline • Set distances R, L • Major changes in grade • Collected at regular intervals • At least every station • Depends on terrain, cost

  16. Construction Grade Staking • Based on “typical section” • Stake centerline, slope “breakouts”

  17. 12’ + 4’(4) + 8’ + 6.3’(4) = 61.2’ Slope Stakes

  18. 12’ + 3.7’(4) = 26.8’ Slope Staking

  19. Rough grade Blue Topping • Rough grade set by slope staking • Set hubs at finish subgrade • Mark top of hub with blue crayon or flag