An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SSD Operations Lilian Martin SUBATECH FY04 STAR Operations Critique Meeting – June, 11th – SSD Operations

  2. Run IV Operations (I) • 10 ladders installed • 4 RDO (reading 5 half-ladders each) installed • SSD in the runs during the Au+Au period (60 +14 Mevents) • Data taking problems : • 1 RDO became silent around mid-Feb. (current explanation : a component died on the RDO board) • 2 RDO’s became silent after the shutdown prior to the p+p period (power cable disconnected) • FEE chips on full ladders were erratically loosing their bias (parasitic RESET produced on the ADC boards) FY04 STAR Operations Critique Meeting – June, 11th – SSD Operations

  3. Run IV Operations (II) • One compressor failure ie no cooling (no explanation, power cycling fixed it) • Few slow control VME board failures (OK after a reboot) • No correct handling of the L2_ACCEPT signal (bug in the RDO FPGA ?) • Operation features/problems : • Relatively easy to operate • Slow Control GUI modified during the run • Operation Manual updated during the run • Online histograms added during the run • Alarm handler prepared but not activated during the run • 2 remote detector experts but nobody on site FY04 STAR Operations Critique Meeting – June, 11th – SSD Operations

  4. Run V plans (I) • Install 10 more ladders in July (7 already produced) • Fix or change the failing RDO board • Fix the RESET problem on the ladders (signal not used by the slow control anyway) • Fix the L2_ACCEPT problem this summer (need suitable DAQ and trigger components for the tests) • Revisit the slow control GUI, operation guide, Online histograms • Integrate the SSD alarms to the STAR alarm handler • Define some typical plots and distributions for the QA • Use the SSD electro. logbook to record SSD problems • Try to have an expert on site (any person from BNL willing to learn is welcome…) FY04 STAR Operations Critique Meeting – June, 11th – SSD Operations