RF Power System: power source, distribution. Paul Drumm RAL. Ambitious title!. RF Baseline Design. RF Power Design driven by cost issues (no funds for a new system) Optimal – one amplifier per cavity 2 Amplifiers from LBNL = 4 MW total 1 or 2 Amplifiers from CERN = 4 MW total
E N D
RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
RF Baseline Design • RF Power Design driven by cost issues (no funds for a new system) • Optimal – one amplifier per cavity • 2 Amplifiers from LBNL = 4 MW total • 1 or 2 Amplifiers from CERN = 4 MW total • If 1 amplifier – needs a bigger drive? • Spare TH116 Tubes from ISIS • Split or more amplifiers? • Circulator – cavity ↔ amplifier isolation • Hybrid device - possibly cheaper – some coupling? • Assume that we do R&D (trials) when we have the equipment • Need both cavities and one amplifier circuit • Test out a hybrid circuit driving two cavities
Progress since October CM • December LBNL • Discussed shipping equipment to RAL • Two 2 MW power amplifier circuits • Three (300kW) driver circuits • 4616 test stand • LBNL loan – to be written off (eventually) • MoU to be signed
… December • At LBNL • Stripping down for transport • Cleaning • Packing • Shipping…
Staff… • Roy Church • Used up quota of days • No Roy till April • RF group at the Daresbury SRS • Mike Dykes (group leader) • Andy Moss (senior RF Engineer) • plus two more • MD & AM are here… ASTeC
Plan for Early 2004 • Limited funds • Berkeley RF system to DL • Strip down and make a technical assessment of the equipment • Cost to refurbish • Confirm equipment is serviceable • 6 month overlap with Roy • Review RF design in the light of CERN RF proposal
For Late FY 2004 • Setting up a test-stand at DL • Hall and facilities available • Need to have got through GW2 • i.e. be in full funding mode
RF Power Systems • 8 MW of RF Power @ 1Hz and 1 ms <8kW> • Expensive to buy new • 201.25 MHZ common to old linacs • LBNL, CERN, ISIS, KEK, Los Alamos • 4 MW from LBNL (2x2MW) + ISIS valves • 4 MW from CERN + new valve ? • How to transmit the power ? • Cheaper, hybrid • Expensive, low risk
Split – Circulator - RF Scheme R.F. LEVEL SUM R.F.LEVEL PHASE SHIFTER 70db COUPLER CIRCULATOR CAVITY TH116 2.5MW 4616 250kW SOLID STATE DRIVER F R MATCHED POWER SPLITTER LOAD CAVITY PHASE TUNE ERROR PHASE DET 70db COUPLER CIRCULATOR CAVITY F R R.F. LEVEL AND PHASE CONTROL LOAD TUNE ERROR CAVITY PHASE PHASE DET 33kV H.T. R.F. SOURCE 18kV H.T.
Baseline ? Master Oscillator 4 MW Transmitter 2 MW Transmitter 2 MW Transmitter 201 MHz Cavity Module 201 MHz Cavity Module 3 db Hybrid & Load Matched Splitter Circulator & Load
TH116 • Thales 5 MW tube • ISIS uses 1 or 2 tubes per year • Few customers for this tube • Thales: • success in small numbers not good • looking at large orders 10-20 tubes • Alternative tubes (?) 2 MW – splitting…
X-Ray Shielding – Conditioning/Running Control Rooms