SCED Penalty Factor

SCED Penalty Factor . Resmi Surendran. Current Values. Maximum Shadow Price for Transmission Constraints Base Case:  $5,000/MW Generic constraints :  $5,000/MW Post Contingency 345 kV:  $4,500/MW 138 kV:  $3,500/MW 69 kV:  $2,800/MW. Power Balance Penalty Curve.

Download Presentation

SCED Penalty Factor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SCED Penalty Factor Resmi Surendran

  2. Current Values • Maximum Shadow Price for Transmission Constraints • Base Case:  $5,000/MW • Generic constraints :  $5,000/MW • Post Contingency • 345 kV:  $4,500/MW • 138 kV:  $3,500/MW • 69 kV:  $2,800/MW

  3. Power Balance Penalty Curve • equivalent to having extra capacity for meeting power balance violation at • (+/-) 3001 $/MWh for violated MW from 0MW to 9999.999MW, and • (+/-) 5000$/MWh for violated MW from 10000MW to 99999.999MW

  4. Constraints 31-Mar - 30-April • 3 violated constraints - 44 intervals • 12 binding constraints - 272 intervals

  5. Violated Constraint 1 DAUSLOS5 - 176T165@FAYETT : FAYETT 138 to WINCHE 138

  6. Violated Constraint 2 DAUSSND5 - 203T260@BUTLER : BUTLER138 to ELGSW138

  7. West to North • Max SF = 0.78759 => Lambda – 3937.95 • Min SF = -0.17723 => Lambda + 886.15

  8. West to North For settlement interval 4/24/2010 0:15 to 4/24/2010 0:30