INDONESIA’S FUTURE EDUCATION NEEDS AND PC BASED SIMULATORS. Fatmuanis Basuki. Meeting of effective Utilization on NPP Simulator Vienna, 19 – 22 May 2014. Outline. Introduction. NPP program in Indonesia Education and Training in Nuclear Field
E N D
INDONESIA’S FUTURE EDUCATION NEEDS AND PC BASED SIMULATORS Fatmuanis Basuki Meeting of effective Utilization on NPP Simulator Vienna, 19 – 22 May 2014
Outline • Introduction • NPP program in Indonesia • Education and Training in Nuclear Field • Implementation Fundamental Training for NPP (Reactor engineering and Safety and IAEA Simulator) • Training Schema for Reactor Operator and Simulator Training • Conclusion
Introduction • Indonesia has been considering introducing • NPP option into energy mix supply for 2000 • MW to be operated in around 2024 or NP • Demontration operated on 2020 • Although definite timetable has not been • determined, the development of basic • infrastructure of NPP preparation which is • included HRD has to be initiated. • ETC-BATAN are responsible for the • development of HRD program for NPP
Nuclear Infrastructure Development Program Nulear power option included within the national energy strategy Milestone 3 Ready to commission and operate the first NPP Milestone 1 Ready to make a knowledgeable commitment to a nuclear programme Milestone 2 Ready to invite bids for the first NPP Phase 4 Maintenance and continuous infrastructure improvement Pres.Reg. 5/2006 Act. 17/2007 Phase 3 Activities to implement a first NPP Phase 1 Consideration before a decision to launch a nuclear power programme is taken Phase 2 Preparatory work for the construction of a NPP after a policy decision has been taken Infrastructure Development Program Construction Operation/ decommissioning Pre Project Project Decision Making Feasibility study Bidding process Commissioning 2006 2019-2024 12 -18 years
Timeline for NP Development in Indonesia INPP Roadmap
Training schedule for Key personnel of NPP 0 -1 -3 -2 -8 -10 22 16 12 19 -12 21 -5 23 24 14 Construction Commercial Operation Civil and foundation Project Implementasion Comissioning Sub. Systemtest Witness during Construction Org. Utility Mech., IC, E, Water Chem, Reactor. Rad Protec. And Env, QA Safety Analysis Nuclear Fuel Operation manager Plant Specification Training staff and NTC Plant operation Management Maintenance Civil and Structure Operation
Timeline for NP Demontration Development Phase1 :Pre Project Phase II:Enginering, procurement and Construction PhaseIII: Comissioning and Operation PhaseIV: Research on cogeneration
Implementation of Fundamental Course for NPP • ETC-BATAN has beenimplementingTC on • Reactor Engineering and Safety I and II • (Basic course of an initial training for • preparation of NPP HRD program) • IAEA simulator are used on RES I Curiculla RE 1 Curiculla RE II LectureSlide October 9 Education and Traing center - BATAN 11
G.A. SIWABESSY REACTOR, SERPONG Oper. since : 1987 Power : 30 MW Function : Research, isotope prod. and testing Hot Cell
Training Schema for NPP Personnel Working Area in NPP
Training and Certification Technician (nuclear Island /BOP) Development /specialty Development /specialty Basic Basic New Employee Competent personnel Introductory of NPP Competency Assessment Certification/Licensing/ Engineer (Nuclear Island/BOP)
Introductory Training for New Employee Operation Engineer New Employee OJT on Plant Sytem and Component OJT Basic Component Knowledge and machinary Arrangement TC Fundamental of NPP TC Industrial safety and Radiation Protection NPP system and comp description and location TC Administratif 12 6 3 9 0 Month
Detail Training Schema for Operator OJT Aux Op. OJT on Shift Aux Patroller OJT aux/TG/NSSS/ their specialties OJT on NSSS secondary. OJT TG Op OJT on NSSS Primary. OJT on TG OJT on Auxiliary TC on Plant Sys. and Component Non license Ops Aux/ equipment Op. New Employee OJT on Shift TG Patroller OJT NSSS 50 wk 50 wk 50 wk 42 wk 8 wk Introductory, Administrative, Industrial safety, Radiation Protection, Introduction to NPP and Familiarization with NPP Phase 1 Phase 3 Phase 2 Operator Aux Operator TG Plant and control sys. and component License Operator Preparation for license Op OJT on NSSS Primary Thermal hydraulics OJT on NSSS Secondary OJT on Turbine Gen OJT on Auxiliary Reactor Physics Reactor safety OJT Shift in control rooms Other TC 8 wk Simulator 8 wk Simulator 8wk 60 Month 36 24 0 12
Conclution • Indonesia has been considering introducing NPP option into • energy mix supply for 2000 MW to be operated in around • 2024 • In order to prepare Indonesian Nuclear HRD who has • appropriate qualification personnel requirement, the • education and training need to be identified, training program • and curricula must be developed. • The Nuclear Training Center for NPP must be equipped with • Simulator (Fullscope or PC Based Simulator) • Development and Utilization of Simulator are urgent to • supprot NPP HRD program in indonesia
INDONESIAN ARCHIPELAGO Bangka