50 likes | 191 Views
Software organization for Phase 1. Started. Management (8.05) Glendenning/Raffi. European Sw Advisory Committee Wallace. Science Software Requirements (8.10) Lucas. High level Analysis and design (8.15) ESO. Software Engineering (8.20) ESO. Common Software (8.25) ESO.
E N D
Software organization for Phase 1 Started Management (8.05) Glendenning/Raffi European Sw Advisory Committee Wallace Science Software Requirements (8.10) Lucas High level Analysis and design (8.15) ESO Software Engineering (8.20) ESO Common Software (8.25) ESO Integration and support (8.70) ESO/NRAO Operations (8.75) TBD Global Project Activities ALMA Software, Control & Communications
Pipeline (8.40) BIMA/NFRA/IRAM Archiving (8.45) TBD Scheduling (8.50) TBD Proposal Preparation (8.55) TBD Data Processing & Analysis (8.60) NRAO Telescope Calibration (8.65) IRAM Software organization for Phase 1 (cont.d) (From previous page) Control (8.30) NRAO Correlator (8.35) NRAO Software subsystems ALMA Software, Control & Communications
Computer architecture for prototypes ALMA Software, Control & Communications
Resources initially committed for this year (FTEs) ALMA Software, Control & Communications
The ESO ALMA Software Team • G.Chiozzi, B.Gustafsson, R.Karban, G.Raffi (TSW) • G.Filippi, J.Schwarz (IT) • F.Biancat (TEL) • M.Albrecht, P.Grosbol, (M.Peron) (DMD) • R.Albrecht (ST/ECF) ALMA Software, Control & Communications