Skate Park PBL Done by: Joel Lee (8) Phua Yue Jun (18) Kevin Tan (20)
Table of Contents Name Venue Design Materials Cost Safety Measures
Our skatepark? Kinect The name is a play on the Xbox console popular amongst students. It also signifies the large amount of kinetic energy the skater will possess. Our skate park is designed to allow experienced skaters to move at fast speeds. Our name is short and straight-forward, simple to remember!
Venue Skate Park We will be constructing our skate park on the edges of the school, field near to the JC side.
Venue Rationale: The area we chose is far enough from any classrooms hence disturbance is at an absolute minimum. It is also easily accessible by students as it is just beside a gate. The terrain there is also appropriate for construction as the place has no rough materials (e.g rocks) around.
Materials Surface: We will be using a new material called Skatelite. Specially designed skate, BMX and inline surface Withstands weather better than plywood, masonite Cheaper than concrete Exceptionally long lifetime indoors/outdoors (4 years outdoors, 6 years indoors)
Materials Additional benefits of Skatelite: Less Friction: It is the smoothest riding surface. Reduced friction results in fewer skin abrasions (or ramp rash) common with other surfaces. Safe Temperature: Metal ramps overheat in direct sunlight and may cause skin burns. Skatelite stays a comfortable temperature in any condition.
Materials Additional benefits of Skatelite: Fire Resistant: It is fire resistant and self extinguishes even under intense flames. Cleaner Friendly: Unaffected by paint thinners and chemicals. It maintains its smooth finish even after the clean up crew removes graffiti. “Maintenance Free”: It is long lasting despite excessive use and punishing weather conditions. If damage is done, the material can easily be replaced.
Materials Body: We will be using concrete. Durable, long life of 30+ years Surface / Structure repairs minimal Although it is expensive, the durability it gives ensures its worth over the years.
Cost Skate Park Dimensions: 8ft x 184ft (2.5m x 56m)
Safety Equipments ProTec Ace Skate Helmet, Caballero Edition ($39.95) ProTec Drop-In Elbow Pads (Pair) ($34.95) Triple Eight KP Pro Knee Pads (Pair) ($56.95) 187 Skate Wrist Guards (Pair) ($18.95)
Final budget estimate: Taking into account we buy approximately 10 sets, ($39.95 + $34.95 + $56.95 + $18.95) x 10 = $1508 Adding on from the cost of materials: $1508.00 + $14582.00 = $16090.00
References http://www.skatelite.com/benefits/index.html http://suburbanrails.com/cgi-bin/WebObjects/PWDA.woa/wa/loadPage?pageId=2013 http://www.skateparkramps.com/skatingsurfaces.htm http://www.buyskatelite.com/occ.php http://www.buyskatelite.com/images/main_image.jpg http://phet.colorado.edu/en/simulation/energy-skate-park http://www.xsportsprotective.com/skate-only-helmets.html http://www.servicemagic.com/article.show.Concrete-Cost-A-Primer.14119.html http://www.xsportsprotective.com/skateboard-knee-pads.html