170 likes | 293 Views
Cross-GEO Coordination Report of C4 Meeting and follow-up discussion. Ivan Petiteville, CEOS GEO ADC Co-Chairs Meeting, Tokyo, Japan, 13 May 2007. Introduction. Location & date: GEO SEC (Geneva), on 13 April 2007 following Task Force 2 (TF2) meeting Participants:
E N D
Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS GEO ADC Co-Chairs Meeting, Tokyo, Japan, 13 May 2007 Slide # 1
Introduction Location & date: • GEO SEC (Geneva), on 13 April 2007 following Task Force 2 (TF2) meeting Participants: • GEO Secretariat: Director ( J.Achache) and whole staff • GEO Committees Co-Chairs: • ADC: Ivan DeLoatch (USA), Alessandro Annoni (EC), Ivan Petiteville (CEOS), Brian O’Donnell (representing Don Hinsman WMO) • CBC: Jose Marcos (Spain) • STC: Udo Gärtner (Germany) (also GEO Executive Committee) • UIC: Gary Foley (USA) Slide # 2
Meeting Agenda • Preparation of Ministerial – Task Force 2 • GEO 2007-2009 WP and related Task Sheets Slide # 3
Preparation of Ministerial Task Force 2 Report Slide # 4
Preparation of Ministerial • All C4 participants attended also the TF 2 meeting (April 11-12) • Committees Co-Chairs responsible for generating the section 3 (“Achievements” ) of TF 2 report. Slide # 5
Section 3 & Annex Content • Description of the major past and current achievements of GEO. • Main achievements accomplished until mid-September 2007 may be reported. • Section 3 complemented by an Annex. • Annex will provide detailed information on GEO activities for which significant progress have been accomplished. • Templates to be filled Slide # 6
GEO Main Achievements Slide # 7
Examples of Activities (1/2) • Presented by GEO SEC during the TF 2 meeting (see ftp://ftp.wmo.int/Projects/GEO/MINISTERIAL/TF2/ ): • GEO Web Portal • Interoperable information systems • GEONETCast • CBERS data for Africa and the Caribbean • Virtual Constellations • Global Digital Elevation Model (DEM) • Global Wild land Fire Early Warning System • Meningitis Warning System in Africa • Solar energy for developing countries • Beijing Olympics • TIGGE • GEO Biodiversity Monitoring Network Slide # 8
Examples of Activities (2/2) • Presented by some TF 2 participants: • Global Geodetic Observing System GGOS • Global Climate Observing Systems GCOS • Sentinel Asia • GEOGrid • Asian Water Cycle • ARGO Array • Seamless Weather and Climate prediction • Common (standard) public warning system/protocol for all hazards • Census of Marine Life • African Observatory • IGOS-P Geo Hazards • Air Quality and Health Slide # 9
TF 2 Report - Schedule Slide # 10
GEO WP and Task Sheets Slide # 11
GEO WP and Task Sheets Updates • GEO 2007-2009 Work Plan updated • version 4, dated March 30, 2007 • Download WP at: http://www.earthobservations.org/docs/WP0709.v4.pdf • Several detailed Task Sheets have been updated by the GEO SEC. • Download all Tasks Sheets at: ftp://ftp.wmo.int/Projects/GEO/TaskSheets/2007-04 Slide # 12
Assignment of GEO 2007-2009 Tasks to Committees • The C4 examined the list of open issues related to the assignment of GEO 2007-2009 Tasks to Committees • All open issues have been resolved & agreed: • The supervision of some tasks have been transferred from one Committee to another one (see slide #14) • For some tasks, close explicit coordination and cooperation between Committees has been proposed (see slide #15) Slide # 13
Task transfer between Committees Slide # 14
Explicit Coordination at Task Level • Coordination between committees identified explicitly for several tasks (GEO 2007-2009 WP): • Tasks supervised at start by one Committee and later by another Committee • Committee’s representatives involved in Task Teams supervised by another Committee • Task supervised by two Committees together Slide # 15
List of “Co-Supervised” Tasks • Tasks supervised at start by one Committee and later by another one • DA-06-04“Data, Metadata and Products Harmonisation”: First by UIC then ADC • Committee’s representatives involved in Task Teams supervised by another Committee • DA-07-03 “Virtual Constellations” and DA-07-04 “Sensor Web Enablement” by ADC with strong involvement of UIC in Task Teams + potential support at UIC level • Task supervised by two Committees together • Jointly supervised by UIC and STC: • HE-07-02, the Environment and Health Monitoring and Modelling • WA-07-01, the Global Water Quality Monitoring • WA-07-02, the Satellite Water Quantity Measurements and Integration with In-situ Data Slide # 16
Implicit Coordination at Task Level • Several tasks supervised by one Committee could benefit from inputs generated by other Committees or be of interest to other Committees. • Examples: • “GEO Web Portal” (AR-07-02) needs inputs from UIC as developed to serve Users • Presentation of the GEOSS Core Components (Clearinghouse, Geo Web Portal, Registries) to be used by the “non-ADC” Task Teams Slide # 17