60 likes | 252 Views
Organizing and Presenting Data. Create a table using Excel : Open new document (Excel). Type Title (A1). Input values for independent variable (mass, angle, length) in column A2. Label columns (Time Period) for the 3 trials (Time 1, Time, 2, Time 3). Enter values for all trials.
E N D
Create a table using Excel: • Open new document (Excel). • Type Title (A1). • Input values for independent variable • (mass, angle, length) in column A2. • Label columns (Time Period) for the 3 trials (Time 1, Time, 2, Time 3). • Enter values for all trials. • Set formula to get average of 3 trials. • Type: =average(then highlight data-B3:D#) • 7. Copy and Paste other cells • 8. Edit table (center, justify, etc). • 9. Set Borders • Tips: • Merging Cells • Right click Format cell alignment merge • Fixing average values • Right click Format cells number Select 2 decimal places
Create a graph using Excel: • Select and drag down first column (independent variable) • click control key select and drag down • average Time period column • 2. Click Insert Select chart • Choose XY scatter. • 3. Click Chart Layout Select Layout 10 • 4.Click Axis Title, label X and Y axis • 5. To delete background, left double click, • select delete. 6. Save graph or paste in a Word document. 7. Add appropriate title to graph.
Using the graph to predict swing height: • Right click on any data point in the graph Select Add Trend line Select Power. • Making projections: (target- 2.8 sec) • Backward forecast: enter number lower than shortest length (9.99- this shows curve of line from 0) • Forward forecast: Right click on trend line Format trend line Options Forward enter 50 or higher • Finding 2.8 sec (Time Period): • Left Double click anywhere on scale Format axis Scale Change major unit (5 or 10) for X axis Change major unit for Y axis (0.2) • 4. Mark predicted length based on a 2.8 Time Period.