100 likes | 245 Views
Spill Point = 5710ft. 1. 2. 3. 4. 5. Crest = 5338ft. Structural Closure = 372ft or ~113m. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 19. 18. Volume = 1/3 (Height x Base Area). GRV (19km2 x 0.113)/3 = ~0.7Km3. ~ +/- 30%. m3 to BARRELS , 1 bbl = 6.29 m3.
E N D
Spill Point = 5710ft 1 2 3 4 5 Crest = 5338ft Structural Closure = 372ft or ~113m 6 7 8 9 10 11 12 13 14 15 16 17 19 18
Volume = 1/3 (Height x Base Area) GRV (19km2 x 0.113)/3 = ~0.7Km3 ~ +/- 30% m3 to BARRELS , 1 bbl = 6.29 m3