60 likes | 322 Views
Digital NOTAM and AIXM 5.1 EAD Implementation Plans. EUROCONTROL/CFMU/EAB. R5-Ext4. Implementation – Timetable AIXM 5.1 - Digital NOTAM. Jul 2010. New obstacle model based on AIXM 5.1. Download Minimum SDO in AIXM 5.1 Download Full SDO in AIXM 5.1. Nov 2010 Jun 2011. R6 R6E2. Upload
E N D
Digital NOTAM and AIXM 5.1EAD Implementation Plans EUROCONTROL/CFMU/EAB
R5-Ext4 Implementation – Timetable AIXM 5.1 - Digital NOTAM Jul 2010 New obstacle model based on AIXM 5.1 Download Minimum SDO in AIXM 5.1 Download Full SDO in AIXM 5.1 Nov 2010 Jun 2011 R6 R6E2 Upload SDO based on AIXM 5.1 to support Initial Operations of Digital NOTAM Spring 2012 R6E4-R7 Remaining SDO based on AIXM 5.1 Spring 2013 Full new interface WS and WFS R7E2 Digital NOTAM
EAD Digital NOTAM Trial • Generation of NOTAM-SNOWTAM / NOTAM-SNOWTAM proposal based on static data elements • AIXM-XML update (Temp delta / perm delta) • ICAO System NOTAM format • Modular approach to generate INTL/NAT NOTAM-SNOWTAM • Create wizard like interface • Upgrade existing INO DP interface • Map view to visualize static data elements and changes resulting from Digital NOTAM • Use of Event Specifications Increment 1
Event Specifications – To be clarified • Necessity of Permanent update • E.g. Create a new obstacle • Full data requirement as for SDO • Operational impact on operator • Timesheet versus Item D) • Information stored in a traditional item D) shall also be possible in timesheet • Operational significance of “comments” that can be associated at entity or attribute level. • Possibility of storage of system NOTAM in comments at entity level • Use of UUID in system format item E)
EAD Digital NOTAM Trial - Milestones • Milestones for 2010 • Next EAD Digital workshop by end June 2010 • Finalisation of specifications by end 2010 • Milestones for 2011 • Implementation of full temporality model • Implementation of required AIXM 5.1 entities for data maintenance • Implementation of Digital NOTAM • Implementation of web services according to approved standard version ( e.g. WFS 2.0, etc.) • Milestones for 2012 • Deployment of Digital NOTAM • Directly available for all EADPro clients
Operational aspects - To be clarified • Technically: • available from beginning 2012, BUT • Availability of the static data (full static data required) • Possibility that countries will not migrate immediately • transition at NOF/ARO • NOTAM processing by EAD: • ECAC: possible translation in digital NOTAM? • World-wide: None or specific events?