PHARE TVET 2004 PROGRAMME REHABILITATION WORKS/ LABORATORY AND SCHOOL WORKSHIPS BUILDING

PHARE TVET 2004 PROGRAMME REHABILITATION WORKS/ LABORATORY AND SCHOOL WORKSHIPS BUILDING. PHARE 2004 Liviu S erb a nescu – NCDTVET expert. The conference of Phare TVET RO 2006/ 018 -147.04.01.02.01.03.01. Project , 13 th – 16 th of May 2009. Institutional roles (1).

hisa
Download Presentation

PHARE TVET 2004 PROGRAMME REHABILITATION WORKS/ LABORATORY AND SCHOOL WORKSHIPS BUILDING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHARE TVET 2004PROGRAMME REHABILITATION WORKS/ LABORATORY AND SCHOOL WORKSHIPS BUILDING PHARE 2004 Liviu Serbanescu –NCDTVET expert The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  2. Institutional roles (1) The Ministry of Regional Development and Housing (former Ministry of Development, Public Works and Housing) contracted the works for 151 education units. The value of the 37 contracte undergoing implementation is 44.864.281 Euros. The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  3. Institutional roles (2) The Agencies for Regional Development are Project Implementation Units (PIU). The PIU also includes the County School Inspectorates. Considering that at this moment the works are in the warranty period, it is the obligation of the County School Inspectorates and of the education unit to monitor the works in the warranty period. The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  4. Stage of rehabilitation works (1) Annex I – “Situation of final work receipts on the 30th of April 2009 - PHARE TVET 2004” presents the education units that benefited from rehabilitation works / building laboratories and school workshops within the Phare TVET 2004 programme. The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  5. Stage of rehabilitation works (2) The works were finalized in the period March 2008 – November 2008. At the moment, the education units are in the warranty period for the works (365 days from receiving the works). The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  6. Status of the works (1) Should there be problems in the warranty period for the works performed by constructors (i.e.: cracks in floors, plasters, rain water floods through the roof / terraces, burst pipes, etc.) the education units/ School Inspectorates are asked to inform in writing the problems that occurred and to send to both addresses : The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  7. Status of the works (2) Technical Assistance for work supervisions – Roughton Group company – in attention of Mrs. Doina Bricman: tel: 021 / 224 44 61; Fax: 021 / 224 44 73 Agencies for Regional Development National Center for Development of Technical and Vocational Education and Training: tel 021 / 311 11 62, fax: 021 / 312 54 98 The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  8. Status of the works (3) If the education unit principals / school inspectors from CSI have questions / aspects to clarify, please contact NCDTVET: tel: 021 311 11 62 e-mail: vet@tvet.ro The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  9. EDUCATION UNITS REHABILITATED WITH MERI A BUDGET (exceptional cases)

  10. During the tender organized by MRDH, the works could not been contracted for 12 education units. For 3 e.u. (from the PHARE TVET 2004 programme) MRDH terminated the contract. The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  11. Annex II – “Situation of the education units in Phare TVET 2004 rehabilitated with MERI budget on the 7th of May 2009” presents the 15 education units that benefited from MERI funds, as well as the status of the works. The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  12. For these e.u., the rehabilitation works/ building laboratories and school workshops are financed from the MERI budget (GD 454 / 2007, GD 919 / 2007, GD 370 / 2008).

  13. Within the e.u. where works have yet to be finalized, there are efforts made to finalize them because the e.u. received equipments for the basic training (PHARE TVET 2005 programme) and are to receive specialized equipments (PHARE TVET 2006 programme). The conference of Phare TVET RO 2006/ 018-147.04.01.02.01.03.01. Project , 13th – 16th of May 2009

  14. THANK YOU! NCDTVET Liviu Serbanescu expert