An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparing for a Successful R7 Migration Ruth A. Pharr Sr. Technical Consultant CISTECH, Inc.

  2. AGENDA • Technical Planning • Installation and Migration • Integration and Testing • Go-Live and Support • Helpful Resources • Summary

  3. Technical Planning • Prerequisites • V5R4 OS level and latest updates • Release 6 • 5722-JC1 Toolbox for Java • 5722-JV1 option 6 • 5722-TC1 TCP/IP for AS/400 • Release 7 • 4438 or higher • SH15532 • Exclusive use of all XA environments

  4. Infor and your affiliate will work with you to verify that your machine will handle new requirements for Java applications (Power Architecture) Collect performance data Use capacity planning tools to determine if hardware upgrades are recommended Perform upgrades in advance Customers who approach R7 implementation this way achieve better results. Technical Planning

  5. Technical Planning • Release 7 Keys • Software • Download Center • ISO images • CD • Additional Applications • Copy empty environment • Evaluate your Customizations • SH15623 for source availability • Auxiliary Machines

  6. Technical Planning Download Center

  7. Installation and Migration • Install target environment • Release 6 • Minimum PTF level 5118 • Release 7 • PTF Level 2581 – 7597 • PTF 9000 not applied • SH14501 • IMHIST Audit Program • SH15625

  8. Installation and Migration • Download the migration tool SH15608 • Release 6 • Minimum PTF level 5118 • Release 7 • PTF Level 2581 – 7597 • PTF 9000 not applied • SH14501 • IMHIST Audit Program

  9. Log in with QSECOFR or a profile with the necessary authority Handling newly added applications End all XA jobs End journaling in ‘to’ environment Log off to reset the library list Run the tool Run Install/Tailor – re-answer questionnaire Installation and Migration

  10. Migrate Kit Components SH85943 pre-requisite fix By site or item or *ALL User Definition and Integrator data Conversion Release 6 Migration Export Integrator changes CLTCNV command Post requisistes PTF for MUI, V6R1 and Fix Apply process Installation and Migration

  11. Migration Considerations Migration replaces data From/To Applications Triggers Simultaneous migrations Customizations and Integrator Object changes Backup of from environment Installation and Migration

  12. Installation and Migration Power Link Install

  13. Installation and Migration Fix Servers

  14. Integration, Tuning and User Training Integrate R7 with custom code COM, IFM, EPDM and EC CISTECH’s Upgrade Assistant: Minimize effort and cost Minimize risk Tune the environment (clients) Conduct User Training Integration and Testing

  15. Final Migration and Go-Live Download and apply latest migration tool fixes Run migration process again Post-Migration Support User Support Download/apply PTFs as needed Client Tuning Go Live and Support

  16. Contact CISTECH or your affiliate for help with: Planning for R7 iSeries Upgrades R7 Installation and migration User Training for R7 applications Integrate your custom code using Upgrade Assistant Performance analysis and tuning Training for IT Personnel Helpful Resources

  17. R7 Power Architecture has more hardware resource considerations LinkManager provides maintenance and administration to application servers PowerLink has replaced the Browser NetLink should be installed on an auxiliary server for best performance SUMMARY

  18. Technical Information Ruth Pharr ruth.pharr@cistech.net 704-814-0007 Sales Information Ben McCormick ben.mccormick@cistech.net 704-814-0016 Thank You!