E-TURB. RADAR – The Next “STEP”

E-TURB. RADAR – The Next “STEP”. “ S YSTEM T ECHNOLOGY E VALUATION P ROGRAM”. Prepared by Dr. Roland L. Bowles AeroTech Research (USA), Inc. Nov. 3, 2004. Outline. E- Turb. RADAR – Where are we? FY-04 ACCOMPLISHMENTS TECHNOLOGY READINESS / CURRENT STATUS

holli
Download Presentation

E-TURB. RADAR – The Next “STEP”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E-TURB. RADAR – The Next “STEP” “SYSTEM TECHNOLOGY EVALUATION PROGRAM” Prepared by Dr. Roland L. Bowles AeroTech Research (USA), Inc. Nov. 3, 2004

  2. Outline • E- Turb. RADAR – Where are we? • FY-04 ACCOMPLISHMENTS • TECHNOLOGY READINESS / CURRENT STATUS • DEMONSTRATE DISPLAY PLAYBACK & ANALYSIS SOFTWARE USING RECORDED In Service Data • SUMMARY OBSERVATIONS TO DATE

  3. E-TURB RADAR – “STEP” Configuration “ SYSTEM TECHNOLOGY EVALUATION PROGRAM ” Delta provided B737-800 NG aircraft ROCKWELL COLLINS Radar System Installed WXR-2100 multi - scan transceiver & antenna STC’s & TSO certified Collins advanced 2nd moment detection algorithm multi - lag auto-correlation ATR provided hazard prediction algorithm & B737-800 NG hazard tables A/C weight to radar Defined hazard criteria & thresholds Fully Integrated cockpit display 2 level g - threshold “situation” display of advisory information E - TURB MODE CERTIFIED NON- INTERFERENCE WITH CURRENT WX-MODES / COCKPIT PROCEDURES

  4. System Implementation Concept FILTERED AIRCRAFT INPUTS WEIGHT & BALANCE TRUE AIRSPEED COLLINS DETECTION ALGORITHM ALTITUDE ^  ATR HAZARD PREDICTION ALGORITHM 2nd MOMENT PRODUCT ( i,j )  “g” units TO THRESHOLD LOGIC & DISPLAYS SPATIAL / TEMPORAL FILTERING “ g” - LOAD CALCULATION B737-800 RAW DOPPLER TURBULENCE MOMENTS AIRCRAFT HAZARD

  5. FY-04 ACCOMPLISHMENTS Key Milestones - Program Start Dec. /03 - Preliminary Design Review Mar. 3 /04 - B737-800 Hazard & Pulse Volume Mar. 3 /04 Compensation Tables Delivered * - “Ship-Set” R/T & Antenna Installed ** Mar.27/04 - B737-800 / WXR2100 STC Approval ** Mar.28/04 - Rockwell Sabreliner Flight Tests Apr.15- June 04 - Operational Readiness Review Aug.10 /04 - TSO Certification Approval Aug.14 /04 - Evaluation R/T Installed / B737-800 ** Aug.22 /04 - In- Service Operational Evaluation Aug.23 /04 – Sept. /05 - Final Report Delivered To NASA Sept.30 /05 * ATR - Rockwell Coordination ** Rockwell - Delta Coordination

  6. E-TURB RADAR IN-SERVICE EVALUATION STATUS • SUCCESSFULY ACHIEVED SIX RADAR DATA LOGGER DOWNLOADS • 3708 OPERATIONS FOR PERIOD AUG. 23 - OCT. 26 • APPROX. 25 HOURS OF RECORDED DATA • RADAR DATA AUGMENTED BY 69 TAPS REPORTS (3708 ONLY) • DEMONSTRATED PRELIMINARY RESULTS USING Beta VERSION OF E-TURB ANALYSIS & PLAYBACK SOFTWARE • PERMITS PLAYBACK OF LOW RESOLUTION WX+T DISPLAYS ON A SCAN-BY- SCAN BASIS • ENABLES COMPARATIVE ANALYSIS OF INSITU “TRUTH” & RADAR PREDICTIVE INFORMATION • BASED ON DATA ACQUIRED TO DATE , WORK IS CURRENTLY FOCUSED ON SCORING E-TURB SYSTEM PERFORMANCE & IDENTIFYING “HIGH VALUE” CASE STUDIES FOR ANALYSIS RLB

  7. 100 80 60 40 20 0 0.05 0.1 0.15 0.2 0.25 NO. EVENTS Vs. OBSERVED RMS NORMAL ACCELERATION TURB. EVENTS* (SHIP 3708) RECORDED FOR PERIOD Aug. 23 - Sept.28 DATA SOURCE EVENT LOGGER TRIGGERS ADIRU#1 @ 50 hz. Processed Identical to Taps . PEAK ACCEL.  5 g's RMS ACCEL.  .15 g's RADAR PRED.  .09 g's A total of 165 events acquired from the first 4 data logger Light DISPLAY THRESHOLDS downloads. LEVEL 1  .09 g's LEVEL 2  .15 g's MANUAL TRIGGER Light to Moderate EVENTS CREW DISCRETION Note: Radar & aircraft data is recorded for each of the 165 events. Events cover all phases of flight. Moderate * 49 TAPS REPORTS FOR THE SAME PERIOD RLB INSITU TRUTH RMS LOAD g's

  8. 3.0 6 FOQA Incidents 18 ICAO Events 49 NASA EVENTS (02) 18 NASA EVENTS (00) 2.5 10 NTSB Accidents 2.0 D h UAL 747 Pacific Accident 1.5 Regression recent incident 1.0 recent incident 3708 DATA 0.5 0.0 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 s D h Correlation of Peak Load With Peak RMS Load ( 5 sec. window) Based on Measurements for 106 Turbulence Encounter Cases + 3708 DATA DATA SOURCES AIRCRAFT MIX / ALL FLIGHT PHASES 747 ' s 757 ' s y = 4.933e-3 +2.651x R^2 = .953 767 ' s 737 ' s L1011 ' s DC10 ' s * Cases Chosen for Detail aal 757 * Modeling to Support FAA Peak l l Radar Certification Effort NASA Flt.* g's 191 - 06 NASA R232-10 xxx 737 * FOQA light (First 4 Downloads) severe extreme light- mod. Peak g's ESTIMATED FROM RADAR OBSERVABLES FOR E-TURB. CONCEPT RLB

  9. Evaluation Methodology E-Turb RADAR Indication of Turbulence Yes No Yes Correct Indication? Missed Indication? No Nuisance Indication? Correct Null? Corroborating Data / Information Sources: E-TURB RADAR Data / Information Sources: Qualitative Quantitative Qualitative Quantitative • ACARS Free Text Questions 1. - 5. • Crew Rept’s Not Logged On ACARS • FOQA • TAPS Rept’s, WebASD Data/ Products • NexRad/ Satellite Imagery/ Products • ACARS Free Text Question 6. • Crew Rept’s Not Logged On ACARS • Jump Seat Observer Comments (if available) • RADAR System Event/ Data Logger (auto & manual activation ) Technical Approach Corroborating Turbulence Data / Information From Non E-TURB RADAR Sources

  10. E-Turb RADAR Evaluation Key Objectives • Establish valid data-driven answers to the four questions implied by the previous contingency table based on a case-by-case analysis using the defined turbulence data/ information sources. • A case study shall commence if and only if there is an affirmative (yes) response either from RADAR or a corroborating data/ information source. • A RADAR affirmative response shall imply exceedance of event logger triggers or display thresholds ( display paints magenta ). • If a sufficient number of cases are identified during the evaluation period, a statistical analysis shall be conducted to score overall performance / success of the E-Turb RADAR system. • Document flight operational “lessons learned” and related guidelines for improved flight safety using E-Turb technology .

  11. Scope of Case Studies • Detailed analysis of a limited number of high value “show case events” which high-light E-Turb RADAR performance. • Tabulate and place outcomes of all admissible turbulence cases in the contingency table. • If a sufficient number of cases are identified; conduct a statistical analysis of overall radar performance and document results.

  12. Tool Set Used For Case-by-Case Analysis • Variety of airborne radar analysis software including low resolution display playback based on radar system recorded event/data logger parameters. (RC) • 3-D wind & turbulence estimators employing FOQA data. (ATR-DAL) • TAPS reports & related data including web ASD information. (ATR) • GIS software permitting overlay of aircraft flight path on NEXRAD/SATTELITE imagery with designated event markers on path & Flt. Vis. dynamic sim. (ATR) Recorded E-Turb. RADAR Data TAPS & WebASD Products FOQA Selected High Value Case Studies ACARS Free Text Questionnaire Response WX-Info. { • E -TURB Radar Display Imagery Reconstruction. • Recovered Turbulence / Wind Time Histories. • TAPS/ web ASD Imagery ( 3708 only ). • Prevailing WX-Information. • Documented RADAR Performance & Operational “Lessons Learned.” Analysis Products

  13. SUMMARY • Basic WXR-2100 system appears to be performing without flaw • E-Turb. functioning as per design & intended function • Based on preliminary data, evidence exists that crews are using E-Turb. to avoid indicated turbulence • Preliminary data indicates good agreement between radar predicted loads and insitu truth when avoidance is not possible • Observer feedback & Taps reports invaluable in aiding analysis • Hard work ahead to score overall WX+T system performance RLB

  14. 8 7 6 h=10 kft " h=25 kft 5 " h=40 kft " 4 3 2 1 0 100 110 120 130 140 150 160 170 180 Radar Observed 2nd. Moment Required to Achieve RMS Load= .1&.2 g's Vs. Weight B737-800 Hazard Tables & Radar Pulse Volume Compensation range = 25 nmi pulse width= 2 µsec antenna beam width= 3.8º .2g ( M2 )^.5 current SW threshold m /sec g- threshold .1 .2 over SW under warn 5 m/ s warn .1g .1g ~ indicative of ride quality boundary .2g ~ indicative of safety boundary WEIGHT klbs RLB