An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AIChE Pilot Plant Benchmarking Study:Introduction • Bob Duggal • Afton Chemical • Richmond, VA

  2. Overview • Background • Objectives • Topics • Methodology • Team Members

  3. Mission Statement: AIChE Pilot Plant Area 12B The Pilot Plant Area is a forum for active interchange of ideas and for the continual improvement of Pilot Plant contributions to quality research and effective scale-up. AIChE programming, benchmarking, operation reviews, and extensive networking form the backbone of the Area activities.

  4. Background • Drivers for Benchmarking Study • Pilot Plant Area 12B Charter • Discussions at Area Meetings • Wide ranging interest amongst members • Proposal, action plan developed in 4Q 2002 • Team formed • Benchmarking topics selected

  5. Benchmarking Objectives • Compile “norms” and “best practices” in areas of interest to Pilot Plant group • Survey members from a cross section of CPI • Disseminate results • In a way that members and organizations can benchmark effectively with • In a format that does not raise competitive issues

  6. Benchmarking Topics • Business objectives for pilot plants • Staffing for construction and operation of Pilot Plants • Pilot Plant Automation • Environment, Health and Safety in Pilot Plants

  7. Methodology • Survey questionnaire drafted by team • Multiple choice format with room for comments • Reviewed at AIChE area meetings, member comments incorporated • Survey sent by e-mail to PDD membership • Responses compiled

  8. Benchmarking Team Members • Current Team • Bob Duggal, Afton Chemical • Rich Palluzi, ExxonMobil • Dan Pintar, UOP • Joe Powell, Shell • David Edwards, Zeton • Sean Murray, Zeton • Previous members • Shiah Cherney, ChevronTexaco • Paul McKenzie, BMS • Kate Threefoot, DuPont

  9. Project Timeline • Finalize topics - Complete • Finalize questionnaires – 4Q 2002 • Drafted by team members with input from Area 12B • Multiple choice format with area for comments • Circulate for responses – 2Q 2003 • Team chose to send to PDD membership to obtain a representative cross section of CPI, representing major industry sections • 31 Respondents • Compile responses – 3-4Q 2003 • Analyze by industry section/demographic • Present at next AIChE/PDD Event • Austin 2004 • Full session with 4 papers and discussion format

  10. Presentation of Results www.pd-aiche.com/area12b