Internalizing Stormwater Requirements Between TBR and Facilities

Internalizing Stormwater Requirements Between TBR and Facilities . Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC. Phase 2 Requirements Review. Public Education Public Participation and Involvement Illicit Discharge Detection and Elimination

holt
Download Presentation

Internalizing Stormwater Requirements Between TBR and Facilities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC

  2. Phase 2 Requirements Review • Public Education • Public Participation and Involvement • Illicit Discharge Detection and Elimination • Construction Site Runoff Control • Post Construction Runoff Control • Municipal Good Housekeeping • Annual reporting on meeting “BMPs” Today’s topics

  3. Construction Site Runoff Control • Traditional MS4s: • Ordinance • Plan review • Routine site inspections/audits • Enforcement • Non-traditional MS4s: • Policies and procedures to require plans, inspections • Internal enforcement auditing process • Inclusion in contracting documents

  4. Post Construction Runoff Control Post-Construction (Permanent) Site Runoff Control • Traditional MS4s: • Ordinance • BMP manual, technical guidance • Plan review • Routine site inspections/audits • Enforcement • Long term operations and maintenance • Non-traditional MS4s: • Policies and procedures to require plans, inspections • Design standards • Internal enforcement auditing process • Inclusion in contracting documents • Long term operation and maintenance

  5. Summary MS4 Permit Req’ts

  6. How to incorporate permit req’ts into current TBR processes? • Statewide standards for MS4-permitted and non-MS4 permitted campuses • MS4-permitted campuses will “self-regulate” to demonstrate compliance with MS4 permit • NonMS4-permitted campuses will ensure CGP compliance at a minimum but may have permanent stormwater practices, as well

  7. TBR Project Designer Stormwater “how-to” for TBR project managers Design, including stormwater Plans review checklist List of acceptable practices Design includes permanent SW treatment practices CGP application Design guidance TDEC NOC As Built Certification form As built certification Construction begins Monthly Audit checklist: Campus Rep Standard operation and maintenance plans Contractor: twice weekly inspections Construction complete Notice of Termination: TBR Project Manager Maintenance SOP by campus Long term maintenance

  8. Stormwater “How-to” for TBR PMs during design • Guidance document with summary “cheat sheet” • Used to help PM understand process and help educate Designers • Plans review checklist • Part of TBR “Construction Runoff Control Program” for universities • Will help to ensure CGP compliance for universities and other campuses

  9. List of Acceptable Practices • Statewide list • May be practices certain campuses choose not to allow • Based upon current BMP Manuals available across the State • Designer could propose non-listed practice • Designer would need to provide O&M plan

  10. Insert “List of Acceptable Practices”

  11. Design Guidance • Used by Designers for the proper design of the acceptable practices (BMPs) • Will apply statewide • May be regionally specific • Designer can provide justification for designing practices not in DG

  12. Update Chapter 3: Design

  13. Add “As-Built Certification Form”

  14. Oversight During Construction • Campus rep responsible for completing monthly audit checklist and verifying CGP compliance • Contractual language may need revision to provide “enforcement” tools to campus rep

  15. Construction Completion • Revise F704 Certificate of Substantial Completion to include • NOT submission requirement • O&M Manuals with certified as-built survey provided to campus and TBR by designer • Permanent stormwater practice logged into database for tracking and annual inspections

  16. Standard O&M Plans • Standard O&M Plans for each listed practice • Designer provides O&M Plan for unlisted practice

  17. MS4 Permit Req’t 4.2.5.7 Owner/Operator Inspections In order to ensure that all stormwater BMPs are operating correctly and are properly maintained, the MS4 shall, at a minimum, require owners or operators of stormwater management practices to: Perform routine inspections to ensure that the BMPs are properly functioning. These inspections shall be conducted on an annual basis, at a minimum. These inspections shall be conducted by a person familiar with control measures implemented at a site. Owners or operators shall maintain documentation of these inspections.

  18. Maintenance SOP by Campus • Maintenance of permanent stormwater practice may look different at each campus • Need for “Activity Owner” who: • Logs inspections per MS4 permit • Follows-up to ensure maintenance is performed as deemed necessary during inspection

  19. Questions?Discussion & Feedback