10 likes | 99 Views
inplane BML6C13 no signal. inplane BOL1A13 signal=3µm?. Monitoring of BT fast dumps. Monitoring of mechanical constraints induced by the quench performed during 10kA test, quench at 2006-10-28 14:00 GMT. projective 1A13RO: 10µm signal in time with quench. Mechanical stress ?.
E N D
inplane BML6C13 no signal inplane BOL1A13 signal=3µm? Monitoring of BT fast dumps • Monitoring of mechanical constraints induced by the quench • performed during 10kA test, quench at 2006-10-28 14:00 GMT projective 1A13RO: 10µm signal in time with quench. Mechanical stress ? inplane BOS2A04 no signal Saclay muon group