Seymour Capilano Filtration Project Seymour Capilano Twin Tunnels. June 4, 2010 Goran Oljaca P.Eng. Seymour Capilano Filtration Plant & Twin Tunnels. Seymour Capilano Filtration Plant. Capilano. Energy Recovery Facility. Pipeline corridor. Pump station. Twin Tunnels portals site.
E N D
Seymour Capilano Filtration ProjectSeymour Capilano Twin Tunnels June 4, 2010 Goran Oljaca P.Eng.
Capilano Energy Recovery Facility Pipeline corridor Pump station Twin Tunnels portals site
Filtration Plant • 1800 ML/d (20.8 m3/s) capacity • Capilano Pump Station • 1080 Ml/d (12.5 m3/s) • 16,000 HP (12,000 KW) • Break Head Tank / Energy Recovery Facility • Facility Flow range 0 – 12.5 m3/s • Turbine flow range 3 – 7.5 m3/s • PRV flow range (each) 0 – 12.5 m3/s • Generating capacity 1.7 MW • Annual Energy Generated 9500 MW.h
Twin Tunnels Treated Water Tunnel Untreated Water Tunnel
Top of Seymour Tunnel Shaft May 1, 2006
Untreated (Raw) Water Tunnel October 6, 2009
Treated Water Tunnel Sept. 1, 2009
Capilano Shaft Site Twin Tunnels Portals Site
Reaming Raise-bore operation 250m to residence Pumping Station Cleveland Dam Spillway 270m deep shafts Twin Tunnels
Temporary Silos for Grouting 10 m 2 m Temporary Silos
Public Impacts and Mitigation Measures • Truck traffic • Noise • Vibrations • Air quality • Landscaping and restoration