240 likes | 341 Views
Identify Question. The Scientific Method. Do Background Research. Construct Hypothesis. Test with an Experiment. Accept or Reject Hypothesis. Report Results. IMPORTANT! Include Science Teacher name on the PAPER copies of research plan and paperwork that you turn in.
E N D
Identify Question The Scientific Method Do Background Research Construct Hypothesis Test with an Experiment Accept or Reject Hypothesis Report Results
IMPORTANT! Include Science Teacher name on the PAPER copies of research plan and paperwork that you turn in. September 30th(next Tuesday) is the deadline for submitting research plan and paperwork.
Projects to be reviewed by Landrum’s Scientific Review Committee (SRC) and/or Institutional Review Board (IRB) : Human Subjects Vertebrate Animals Microorganisms Hazardous Activities (Chemical Reactions, Electricity, Fire) All other projects do not require special approval and can begin once paperwork is reviewed and corrected.
What needs to be submitted for project approval? Detailed Research Plan
Please be sure that you follow the Detailed Research Plan Instructions!
"Battery." Encyclopedia Britannica. 1990. "Best Batteries." Consumer Reports Magazine 32 Dec. 1994: 71-72. Booth, Steven A. "High-Drain Alkaline AA-Batteries." Popular Electronics 62 Jan. 1999: 58. Brain, Marshall. "How Batteries Work." howstuffworks. 1 Aug. 2006 <http://home.howstuffworks.com /battery.htm>. "Cells and Batteries." The DK Science Encyclopedia. 1993. Dell, R. M., and D. A. J. Rand. Understanding Batteries. Cambridge, UK: The Royal Society of Chemistry, 2001. "Learning Center." Energizer. Eveready Battery Company, Inc. 1 Aug. 2006 <http://www.energizer.com /learning/default.asp>. "Learning Centre." Duracell. The Gillette Company. 31 July 2006 <http://www.duracell.com /au/main/pages/learning-centre-what-is-a battery.asp> • What needs to be submitted for project approval? • Detailed Research Plan • Bibliography with 5 sources
What needs to be submitted for project approval? • Detailed Research Plan • Bibliography with 5 sources • Forms 1, 1A, and 1B
What needs to be submitted for project approval? • Detailed Research Plan • Bibliography with 5 sources • Forms 1, 1A, and 1B
What needs to be submitted for project approval? • Detailed Research Plan • Bibliography with 5 sources • Forms 1, 1A, and 1B
What needs to be submitted for project approval? • Detailed Research Plan • Bibliography with 5 sources • Forms 1, 1A, and 1B • ADDITIONAL forms for projects requiring SRC/IRB approval
How Will the Approval Process Proceed? • Step 1: Submit PAPER copies of research plan and forms to Mr. Anzelmo for initial review. • Step 2: Make corrections and revisions to research plan and paperwork. • Step 3: Check your (parents) email SOON for a message from scifair@outlook.comand respond. • Step 4: Get invite for Dropbox and set up your account. • Step 5: Place corrected DIGITAL documents in your Dropbox account. • Step 6: Send email to scifair@outlook.com stating that you are ready for SRC/IRB review. • Step 7: Periodically check your email and Dropbox for forms that are approved (“PASS” folder) or ones that need further attention (“Requires Further Action”) • Step 8: If paperwork “Requires Further Action”, make corrections, place in Dropbox, and send email to scifair@outlook.comstating that corrections are completed. • Step 9: Cross your fingers an wait for project approval email from scifair@outlook.com
Step 1 You will be sent an email with an invitation to your private “Dropbox” document repository.
Step 2 Web Browser Email box Takes you here Click here
Step 3 Create your account or sign-in if you already have one If you have an existing Dropbox you must use the email associated with it for the science fair folder share.
Finally: Send an Email to scifair@outlook.com Let us know that all your documents are sitting in the repository for approval If something “Requires Further Action” It will be placed in the requires further attention folder in your Dropbox. All approved documents will be placed in the “Pass Folder”
If your paperwork receives a comment or the reviewer cannot sign it until its corrected, you will receive an email to view your “requires further action” folder. The comments will be attached to the document on a “post it” note.
DROPBOX CHECKLIST: Allmust be in Dropbox for approval Research Plan (file clearly named) Bibliography (file clearly named) Forms 1, 1A, 1B Additional forms specific to your project: Human Subjects (form 4), Vertebrate Animals (form 5A/B), Microorganisms (6), Hazardous chemicals or activities (3)
If you need help, send an email to scifair@outlook
For projects with Human Subjects: • For project approval, you will need to submit ONE copy of YOURHuman Informed Consent Formfor review • Can be found under All Science Fair Forms on Landrum Scifair website • AFTER appoval, you will need a copy of this form for EVERY participant you test. They can be PAPER copies, signed in ink, and kept in your binder. I’M SORRY