1 / 2

Photoreceptor Power Consumption Optimization

Photoreceptor Power Consumption Optimization. TEAM V.S.Guleria (Elect.& Inst. Maintenance) Leader Sompal Sharma (Elect.& Inst. Maintenance) V.P. Joshi (Mech. Maintenance) WUZ Khan (Production) Devi Das (Production) SK Rana (Production) PK Tyagi (Production)

hu-bowers
Download Presentation

Photoreceptor Power Consumption Optimization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Photoreceptor Power Consumption Optimization TEAM V.S.Guleria (Elect.& Inst. Maintenance) Leader Sompal Sharma (Elect.& Inst. Maintenance) V.P. Joshi (Mech. Maintenance) WUZ Khan (Production) Devi Das (Production) SK Rana (Production) PK Tyagi (Production) CK Sharma (Production) K.P.Singh Facilitator ACHIEVEMENTS 1) Total savings in Photoreceptor plant power consumption 485429 kWh (32.4%over 2001) Savings in Power consumption per drum = 24.5% 2) Total cost savings = $ 50.5K PROJECT STARTEDJan, 2002 IMPLEMENTATION COMPLETED Mar, 2002

  2. Initiatives Status (1) Managing clean room operation without running chillers during winter months & other periods when ambient temp. was below 18 deg C Done (Jan,02) (2) Optimize AHU’s run hours in line with production volumes. Done (Feb,02) (3) Complete shutdown of AHUs & other equipment's after completing of production Done (Jan,02) (4) QIP on Mask strip power optimization Done (Mar 02) (2) Total Energy Consumption (kWh) Problem & Desired state 32.4 % reduction over 2001 Total Energy Consumption (kWh) kWh per Drum Results Achieved (1) Fixed components’ power consumption reduced by 34.4% 4 % Target Cost savings = $ 50.5K 24.5 % reduction over 2001 (3) kWh per Drum 1052400 690507 Power consumption (kWh) Production comparison 1997 - 87590, 1998- 111582, 1999 - 95651, 2000 -- 103646, 2001 - 84171, 2002 - 75659

More Related