An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. G. Blanchot - Endicott Meeting at CERN CMS Hybrids for the Tracker Upgrade G. Blanchot

  2. Outline • Double sided strip module and hybrid topology. • 2CBC2 Prototype. • Procurement. • Samples. G. Blanchot - Endicott Meeting at CERN

  3. Double Sided Strip Module Topology CBC CBC HYBRID 2x1016 STRIPS HYBRID COOLING & SUPPORTING STRUCTURE 2x1016 STRIPS Today’s estimation is: 4416 modules for the barrel. 5208 modules for the endcap. 2CBC2 Prototype • Parameters (per side) • Double sided, 50mm strip detector, 1016 strips (127x8), 90u pitch. • 8*254 inputs CBC ASICs on top side of hybrid. • Collects 1016 inputs from top, 1016 inputs from bottom. • 1 Concentrator ASIC • Common blocks • 1 DC-DC converter to power the hybrids. • 1 Charge Pump to power the optical link. • 1 GBT interface. • 1 Optical Link module. G. Blanchot - Endicott Meeting at CERN

  4. 2CBC2 Block Diagram Input DiffPair Clock TMM-104-01-G-D-SM 2.5V 1.2V CBC2A LDO BotSensor Top Sensor BOT CLK DCDC P/N HV Bias HV Contact 256 inputs 80um pitch CLK40, CLK160 P/N 4 * FASTCONF SDA, SCLK FTSH-140-01-F-DH-A CBC2B TOP 2 * DATAOUT_T P/N 2 * DATAOUT_T TMM-104-01-G-D-SM Output SE and Diffpair Clock G. Blanchot - Endicott Meeting at CERN

  5. CBC2 Flip Chip ASIC FLOORPLAN VIEWPOINT CBC #n-1 Last Pin (771) Previous CBC CBC 2 No Pins Ch#1 TOP Ch#1 BOT SUBSTRATE 4.725 mm TOP1 TOP2 BOT1 BOT2 CBC2 ASIC in foundry, due for beginningnovember. TOP4 BOT3 TOP5 BOT5 BOT4 TOP3 SENSOR SIDE (Wirebonds) READOUTSIDE Bump pitch = 250 μm 771bumps / ASIC CBC #n 11.025 mm TOP115 BOT114 TOP116 BOT116 BOT115 TOP114 TOP118 BOT117 TOP119 BOT119 BOT118 TOP117 3 No Pins TOP121 BOT120 TOP122 BOT122 BOT121 TOP120 TOP124 BOT123 TOP125 BOT125 BOT124 TOP123 NC TOP126 TOP127 BOT126 BOT127 Channels Sequence NC Pin 1 No Pin Next CBC Test bond pad row Pin#1 CBC #n+1 G. Blanchot - Endicott Meeting at CERN

  6. 2CBC2 Prototype • Substrate Choice and Surface Finish • CoreEz 1-4-1 with thin LCP core: 4 core layers + 2 build-up layers. • ENEPIG surface finish for compatibility with wirebonding and with flip chip bonding. • Flip Chip bumps: IBM C4 Pb97Sn3. • Design Iteration • Release 38 reviewed by John Barinaat EIT and released for production. • Several issues have been sorted out with the feedback from EIT team. • Purchaseorder has been launchedat CERN and isapproved, shouldshortlyreach EIT. • Draft design • 30 hybrids will be assembled with parts, and will be underfilled. • Some passives will be coated with underfill. • 25 hybrids will be assembled with parts, without underfill. • Full access to passives, bumping cross check. • 5 hybrids will be delivered unmounted. • Mechanical evaluation samples. G. Blanchot - Endicott Meeting at CERN

  7. 2CBC2 Prototype • TOP layer: • Diff pairs spacing solved. • Passives close to dice will be covered by underfill. • HV pads clearance complies with IPC-2221A. • Clearance with HV pads and internal power and GND layers is out of spec for IPC2221A, the breakdown voltage curves supplied were taken into account. G. Blanchot - Endicott Meeting at CERN

  8. 2CBC2 Prototype • Inner planes: • Venting holes added as requested. • Better adhesion of the laminate layers. • Edge clearances for Power and GND layers fixed. • Area matching: • Copper area coverage matched between top and bottom layers. • Same for soldermask. • Area balance checked, substrate will stay flat. G. Blanchot - Endicott Meeting at CERN

  9. Assembly • Bill of materials and placement file delivered. • Some components are not to be mounted by default (red). • Detailedassembly instructions are delivered. • Parts are all supplied by CERN. G. Blanchot - Endicott Meeting at CERN

  10. Mechanicalsamples • The properties of the substrate material needs to be evaluated in detail for its integration into modules: • Thermal expansion. • Thermal conductivity. • Flexibility and flatness. • Wire bonding tests. • Assembly properties with glues, compatibility with supporting materials. • Reliability of laminate stack. • We would like to evaluate materials other than CoreEz if available or suitable to our application. • See discussion with Alan Honma about these specific issues. • Low CTE materials • Samples. G. Blanchot - Endicott Meeting at CERN

  11. 8 CBC Design CBC CBC HYBRID 2x1016 STRIPS HYBRID COOLING & SUPPORTING STRUCTURE 2x1016 STRIPS Today’s estimation is: 4416 modules for the barrel. 5208 modules for the endcap. 8CBC2 Prototype • Parameters (per side) • Double sided, 50mm strip detector, 1016 strips (127x8), 90u pitch. • 8*254 inputs CBC ASICs on top side of hybrid. • Collects 1016 inputs from top, 1016 inputs from bottom. • 1 Concentrator ASIC • Common blocks • 1 DC-DC converter to power the hybrids. • 1 Charge Pump to power the optical link. • 1 GBT interface. • 1 Optical Link module. G. Blanchot - Endicott Meeting at CERN

  12. Procurement Plan • 8 CBC Prototype • Integrated in the CMS Hybridsprocurement plan thatisbeingprepared right now. • Must follow the CERN procurementrules as itisgoing to beexplained by Dante Gregorio. • Start point is a marketsurvey, a technical questionnaire and a qualification criteriaspec. • The 8 CBC design willbe open to severalcompaniescompeting for the best productat best price. • Several prototypes willbebuiltwithdifferentsuppliers. • Mass, CTE, substrateroutingdensity and performance, cost, will all be dominant aspects for the qualification of suppliers. • Rigid and flexible substrate technologies are going to beinvestigated. • Severalrigid and flexible supplier companies have been identified and all are expecting the marketsurvey to bereleased. • Rigidbuild-up substrates and flexible polyimide foils willbeevaluated. Eachprocessinvolvesverydifferent module integration aspects thatwillbestudied. G. Blanchot - Endicott Meeting at CERN