Decommissioning of CTF3

Decommissioning of CTF3. Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may influence your decisions as to what we are going to do at the end of CTF3 run. CTF3 foreseen to stop at end of 2016

huey
Download Presentation

Decommissioning of CTF3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may influence your decisions as to what we are going to do at the end of CTF3 run

  2. CTF3 foreseen to stop at end of 2016 • Future use of the CTF3 complex • 4 different zones • Linac and gallery • Delay loop – combiner ring • CLEX • CTF2 • Radiation • Available manpower • Storage

  3. Some ideas that have been suggested • Simplest solution close the complex and lock the doors • Continue running CTF3 • Costs • New access control system needed • Upgrade of modulator controls (get rid of non supported CAMAC) • manpower • Reuse the Linacand rings for electron injector to PS • Costs • New access control system needed • Upgrade of modulator controls (get rid of non supported CAMAC) • manpower • CLEX • Keep CALIFES operational • New access control system needed • New DB injector test area • Use LINAC area but probably need civil engineering work in CTF2 area to allow modulators and klystrons to be installed (too large for gallery) • CTF2 • Continued PHIN tests, X band test area • New access system needed

  4. Example of clearing out an area B.2001 Klystron Gallery LINAC Gallery LINAC Controlled area Not INB .. No INB paperwork needed  Each item that is removed needs RP control (full time RP technician in situe necessary ) Timescale …… some weeks maybe months Storage area needed for activated items Storage area needed for non activated items No radiation issues as installation is not activated Mainly klystron modulators Magnet Power supplies Control racks Any requests for reusing components? Significant manpower needed for removal and reinstallation

  5. Conclusion • Any ideas on what should be done with CTF3 complex and its equipment need to be thought out carefully and propositions should have solutions for manpower, upgrades, space and storage. • 2017 is only 34 months away start thinking now to avoid surprises