1 / 2

TTWCS LEAD LAB

TTWCS LEAD LAB. COMPLETED TECHNICAL EFFORTS Supplied comments to the ORD/TEMP trace. Supplied comments to the TEMP Supplied comments on ICN A6B to 3600/114 ONGOING TECHNICAL EFFORTS Ongoing effort to trace all SSS requirements to ERB approved CDDs. No due date

hume
Download Presentation

TTWCS LEAD LAB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TTWCS LEAD LAB • COMPLETED TECHNICAL EFFORTS • Supplied comments to the ORD/TEMP trace. • Supplied comments to the TEMP • Supplied comments on ICN A6B to 3600/114 • ONGOING TECHNICAL EFFORTS • Ongoing effort to trace all SSS requirements to ERB approved CDDs. No due date • PSEC Mod 10 and 12 Review and renumber additional requirements and distribute for reviewers. No due date • TTWS CONOPS IWG • LASM working group • STATUS OF 3900/XXX • 3900/146 ICNs 1 through 6 are in preparation by SAIC • 3900/145 is currently being produced by SAIC. No date when draft is due. • 3900/114 • A5 - waiting for input from Raytheon • A6B reviewed and commented on • A8 reviewing • IDS-9 Rev G • ICN 1A - awaiting distribution from SAIC • ICN G2A – in review (sub only)

  2. TTWCS LEAD LAB • CDD REVIEWS AND ISSUES • There are 3 remaining CDDs: Built-In-Test, PMFL and TSN which are currently on the Increment 4 schedule that have not yet been posted to the Lockheed Martin secure site. • IDS WS 20931 & WS 20932 SUPPORT • ICRs to implement TTWCS-VLS-TT AUR digital interface changes are in process. • WS 20931/3, WS 20931/4, and WS 20932/2 ICRs have been through technical review and all but a few signatures obtained. APL raised an issue with DSMAC data loading last week which will be discussed in a telcon Tuesday afternoon, 2/29/00. There may be an impact to MM design, depending on the outcome. • TTWCS LAC DEVELOPMENT • For TTWCS, OPNAV Memo N864F tasks PMA 281 to expand the capabilities of ETEPP to provide LAC tools for use when LAC is on-board a TTWCS platform. This is interpreted to mean TTWCS has been relieved of any requirement to provide tools for a LAC. • According to Tom Depew, LMVF TTWCS contract has already been amended to delete LAC. Tom has opposed removing requirements until written direction is received from PMA 282. • ATWCS LAC DEVELOPMENT • K Dept expects OPNAV to publish a Memo similar to the TTWCS memo, relieving ATWCS of requirements to provide on-board LAC tools. • Gene Oliver has the lead in conducting a study of alternatives to implement the new LAC guidance, when it is received. • No changes to the current ATWCS Build 1.7.1 will be made until specific guidance is received. • Study results to date are scheduled to be briefed to the SEWG on Wednesday, 3/1/00. The brief may be repeated to the SET on Thursday, 3/2/00.

More Related