Module 18

Module 18. Activity-Based Costing, Customer Profitability, and Activity-Based Management. Traditional Product Costing. Overhead Costs allocated to Products By direct labor or machine hours Traditional results will be inaccurate when Products differ on use of resources, like

Download Presentation

Module 18

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Module 18 Activity-Based Costing, Customer Profitability, and Activity-Based Management

  2. Traditional Product Costing • Overhead Costs allocated to Products • By direct labor or machine hours • Traditional results will be inaccurate when • Products differ on use of resources, like • Frequent design changes • Specialized equipment • Complex setups • Difficult customer specifications

  3. Activity-Based Costing (ABC) Resources are assigned to activity costs, which are then assigned to objectives by cost drivers. *Based on units of activity utilized by the cost objective For example, consider purchasing and receiving:

  4. Example Activity CostsPurchasing Interviews determined that 15% of the time, receiving room employees verified purchase orders, and 85% of their time was spent unloading, unpacking, and inspecting. Supervisors were found to spend 30% of their receiving time on verifying issues, with the other 70% on unloading, unpacking, and inspecting issues.

  5. Cost per Unit of Activity • Each activity results in a different rate • Rates are used to apply costs to cost objectives Assume direct materials totaling $120,000 are to be acquired during the month with 300 purchase orders.

  6. Assigning Activity Costs to Cost Objectives Assigning costs to a purchase order which has a materials cost of $1,600 for 500 parts.

  7. ABC Implementation • ABC is expensive to implement • After switching to ABC, companies may find that only 10 to 15% of their products are profitable • Causes management to alter the product mix by minimizing unprofitable products which causes profits to increase

  8. Customer Profitability • ABC may be used for customer profitability analysis. • Customer costs to be analyzed • Cost incurred to sell the goods or services • Cost incurred to provide service • Actions possible from analysis • Convert customers to profitability or increase profitability • Seek to terminate unprofitable customer relationships

  9. Continued ABC Customer Profitability Analysis Example What activities are required to serve customers? Customer activity costs for Haskell Construction:

  10. ABC Customer Profitability Analysis Example Customer profitability ratio: $13,970 ÷ $79,000 = 17.7% Customers found to generate losses should be flagged and efforts made to correct the situation or terminate the customer.

  11. Activity-Based Management • Identification and selection of activities to maximize the value of activities while minimizing their cost from the perspective of the final consumer • From the perspective of the final customer, what adds value to the product?

  12. Activity-Based Management • Value Added: Required activities to produce a product and serve customers. • Examples: Produce product, fill customer order • Non-Value Added: Not required to produce a product or serve customers well. • Examples: Inspections, waiting, customer returns, storage, downtime for repairs, redoing anything