An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS RPC: update produzione, risultati tests ed analisi extracosti • Schedula • Test camere • Sito di Napoli • Sito di Pavia • ISR • GIF • DB • Aggiornamento costi Collaborazione CMS RPC Italia Gruppo I 12-13 Maggio 2003 Presentato da G. Iaselli

  2. CMS RPC production scheme Revised version Assumptions for phase I (end 2003/start 2004) Glossary • PV is devoted to chamber test only and to bakelite QC; • An additional external company (HT) will be involved in the assembly (under the control of NA group); • Gap production and quality control remains mainly with the BA group with some help from the NA group; • Chamber assembly at GT remains with the BA group only; • BA remains as chamber test site and an assembly sites for RB3 chambers in the first phase. PV Pavia INFN group NA Naples INFN group BA Bari INFN group GT General Tecnica (Frosinone) HT High Tech (Caserta) CERN CERN-ISR SO Sofia group PU Peking University group More assumption for phase II (2004/2005) • SO becomes an assembly and test site for RB3 in the phase 2; BA site can be considered as back site for RB3 assembly in case of difficulties; • RB1 chambers are built in Italy (GT) and tested at PV • A way to involve physicists from PU in the RB1 test should be envisaged; • RB2 are built at HT and tested at BA.

  3. RPC chambers production plan: phase I NA group is involved in the RB1/RB2 assembly at HT and the tests at BA PV group is involved in the test of chambers RB1 BAgroup is involved in the assembly and in the test at BA. BAgroup is also involved in the assembly at GT. CERN • Assembly BA + SO:28 RB3 GT: HT: 33 RB1 • Test BA +SO: 28 RB3 BA: 36 RB4 + 48 RB2 +6 RB4 (2500 mm) PV: 33 RB1 BA+NA: 13 RB2 + 6 RB4 Pavia Bari GT HT Napoli

  4. RPC chambers production plan: phase II CERN • Assembly • SO:72 RB3 • GT: 72 RB1 + 78 RB4 • HT: 72 RB2 • Test • BA: 78 RB4 + 36 RB2 • PV: 72 RB1 • SO: 72 RB3 • BA+ NA: 36 RB2 Pavia Sofia Bari GT HT Napoli

  5. Gap production

  6. Double Gap production

  7. Chamber production

  8. Test set up in Bari • Efficiency • Cluster size • Noise rate • I-V dependense • Strip noise profile

  9. Results on RB2 Efficiency Cluster size Noise

  10. Global results Efficiency Cluster size Noise

  11. HT • Capannone disponibile (circa 250 m2 per un’altezza di 10 m.) • Tavolo di assemblaggio consegna prevista venerdì 9 maggio • Attrezzatura delle scaffalature e carro ponte in corso. • Entro la fine di maggio HT pronta ad assemblaggio pilota • Test previsti: • Leak test • Test di tenuta del sistema del sistema di cooling • Test di continuità delle strips • Con tester • Con frequenzimetro • Test schede di Front-end (corrente assorbita dalle FEBs) • Test HV • Correnti vs HV • Single rate vs HV

  12. HT Sistema HV Sistema LV Field point

  13. Pavia Trigger: HV e segnali cablati e funzionanti Logica di trigger funzionante  Gas: linee del gas pronte ma disponibili dalla prossima settimana. Distribuzione del gas delle linee interne testate e funzionanti. DAQ: a posto.

  14. Pavia Sistema gas Sistema HV trigger

  15. ISR • Test area • HV Test, cosmic test , DAQ. • Gas needed • RPC - DT Coupling • Labs • Tooling storage and working area + semi-clean room. • Pre-coupling storage • Basic validation tests • Current vs Voltage curves (mandatory) • Noisy strips (mandatory) • Dead strips (mandatory) • Efficiency vs Voltage • Single rate vs threshold

  16. ISR • Needed • Safety gas system 15000 CHF) • Gas distribution system 3000 CHF) • Set up of trigger system • DAQ/monitor/analysis system: • Signal cables (4 chambers) ~ 20000 CHF • HV/LV cables

  17. Data Base • It stores all the informations related to the construction of: • Bakelite • Single and Double Gap • Chambers • FE Electronics • …and all characteristics and testsperformed on these devices It is implemented in MySQL (the DB) and PHP/Javascript (the interface) It ispublic and completely WEB interfaced: You can read from everywhere You can write data from everywhere: GT, Bari, Pavia, Naples, CERN, etc. Just connect to: http://www.ba.infn.it/rpc • Advantagesof the choice MySQL/PHP: • They (both MySQL and PHP) are free • Very good performance (comparable to very expensive systems … ORACLE) • It was the first Construction DB available in CMS: • Very good interface, developed at home • Graphic possibility to display and compare data: efficiency, currents,… • Tools for production coordination • Summary tables

  18. GIF 4 Gap (50x50 cm2) under irradiation since June 3 Gap (50x50 cm2) with “new” bakelite under irradiation since September 2 RB1 under irradiation since January We are continuously monitoring with and without Gamma SOURCE Currents Rates Efficiency Fast Charge Small gaps RB1 Rate: 30 Hz/cm2 (safety factor included) Average total charge: 30 pC Effective operation time: 5x107 s (10 LHC years) The total expected charge is be 5 10-2 C/cm2

  19. Accumulated charge Small gaps ”old bakelite”, 7 CMS years Small gaps ”new bakelite”, 4 CMS years RB1 We expect to reach the barrel limit in the summer for the small gap and at the beginning of next year for RB1

  20. Small gaps BEAM PERIOD 2002 OLD bakelite ABS1  200 Hz/cm2 Average Efficiency ABS1 Source OFF Efficiency at plateau DEff at plateau  0.6 %

  21. Small gaps Shutdown Period 2002/2003 TEST with water Old bakelite RPC #9 never irradiated!! High gas flux rate: # volume 17 103 expected in CMS: # 5 103 Possible change of resistivity!! New bakelite Efficiency and rate capability is restored with “wet” mixture

  22. RB1 counting rate at different test periods @ ABS1 ABS1  200 Hz/cm2 currents at different test periods @ ABS1

  23. RB1 Comment Activity at GIF (+ test beams) is taking an increasing amount of financial and manpower resources in conflict with other major activities (production and tests at assembling sites, ISR) The close loop gas system will be in operation this week. A detailed study of the aging effect due to some polluting compound in the gas mixture has to be carried on.

  24. COST OVERVIEW COSTO 1999 (KCHF) # item KCHF Rivelatore 2.352 Electronica Front-end 684 Sistema HV and LV 580 Supporti 210 Installazione 340 Monitoring 60 Servizi 120 Totale 4.347 Finanz. (KCHF) Italia 3400 Cina 235 Bulgaria 440 Tot  4100 CORE al 2002 (KCHF) Italia 3200/3400 Cina 110/235 Bulgaria 440/440 Tot 3750/4100 Il restante contributo dalla Cina (125 KCHF per l’assemblaggio delle stazioni RB1) non sembra facilmente “trasportabile” su altri item se l’assemblaggio viene spostato in Italia

  25. Costi per il completamento HV/LV 1066 K€ (1600 KCHF) * DCS/Slow 67 K€ ( 100 KCHF) Bachelite 113 K€ ( 170 KCHF) Gaps/Dgaps 203 K€ ( 305 KCHF) Camere 107 K€ ( 161 KCHF) Tras./instal. 105 K€ ( 158 KCHF) Totale 1300 K€ (1950 KCHF) * Vedi presentazione dedicata 1 Euro = 1.5 CHF COSTO (KCHF) 1999 2003 Rivelatore 2.352 Electronica Front-end 684 Sistema HV and LV 580 Supporti 210 Servizi 120 Installazione/trasporti 340 Monitoring 60 Totale 4346 6350 Anche dopo il contributo addizionale INFN di 1.6 KCHF, c’e’ ancora un deficit di 800 KCHF!!! 2350 + 650 970 1100 100 420 160 100

  26. BACHELITE • Importo gara: 300 MLire (IVA esclusa) • Costo vecchio: 19950 Lire/mq (IVA esclusa) + costo filmatura 1200 Lire/mq (IVA esclusa) • Taglio vecchio: 10000 Lire/lastra (IVA esclusa) • Pannelli : 3762 per un totale di 14038 mq • Nuovo costo: 14,95 Euro/mq (IVA esclusa) • Taglio nuovo: 5,16 Euro/lastra (IVA esclusa) • Pannelli da ordinare ( vd tabella extra costi - a = 0.30) 1518 • Extra costo (a = 0.30) 94100 Euro (taglio compreso IVA esclusa) per un totale di circa 5616 mq ( 3.7 mq/lastra)

  27. GAP/DOPPIE GAP Gaps: 15.5 € /Gap 31600 € Double Gaps: 29.0 € /DDap 29580 € Tools 775 € /tool (30 gap frames) 23250 € 181 € /tray (30 trays) 5430 € 517 € / trolley (3 trolleys) 1551 € 30231 € 120 Gap scartate fino a Dicembre 2002 27000 € 350 Gap da scartare fino al termine produzione* 80000 € 107000 € Totale 203000 € * Previsione assumendo una scarto del 20% e un costo medio per gap di 230€

  28. Stazioni Assemblaggio stazioni 116 stazioni devono essere assemblate a HT (500 Euro/camera) 60.000 euro Componenti per le camere Canaline per cavi segnali Coperture di alluminio Connettori gas Pipe di collegamento camera/pannello Pipe gas all’interno della camera 47.000 Euro Lavorazioni in Cina per recuperare il CORE rilasciato?? Totale assemblaggio stazioni 107 KEuro

  29. HV/LV Sistema # ch costo (KCHF) 1)Sistema completo 16 ch_HV/settore 1600 sul detector 32 ch_LV/settore 2)Sistema minimo 8 ch_HV/settore 930 sul detector 8 ch_LV/settore 3)Sistema minimo 6 ch_HV/settore 1000 in control room 8 ch_LV/settore L’opzione 3 garantisce un risparmio consistente, un facile upgrade del sistema in futuro ed una più efficace manutenzione durante il running

  30. Approfondimenti Item approfondimenti su: http://www.ba.infn.it/~iaselli/Gruppo1_maggio_2003/ Schedula schedula_maggio_2003.xls Test camere risultati_test.ppt Sito di Napoli(HT) sito_HT.ppt Sito di Pavia sito_Pavia.ppt ISRISR.ppt GIFGIF_camere_grandi.pptGIF_camere_piccole.ppt Aggiornamento costiextra_costi_bachelite.pptextracosti_Marzo_2003.ppt Altri approfondimenti Bachelite relazione_bachelite_Roma_Marzo_2003.ppt HV/LVHV-LV.ppt CMS RPC DB http://www.ba.infn.it/rpc