1 / 4

CMS RPC muon system

CMS RPC muon system. RPC detector performance - 2010-2012 runs. Three HV scans between 2011 and 2012. Very stable results (HV 50% - HV WP ). Average detection efficiency was about 95 % a t the end of the 2012. Automatic working point correction versus P/T

teenie
Download Presentation

CMS RPC muon system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMS RPC muon system

  2. RPC detector performance - 2010-2012 runs Three HV scans between 2011 and 2012. Very stable results (HV50% - HVWP) Average detection efficiency was about 95% at the end of the 2012. Automatic working point correction versus P/T was fundamental to stabilize the performances. Inactivech. % Number of “disconnected” channels was stable between 2 and 2.5 % (noisy channels, electronics problem and HV/LVoff channels)

  3. RPC hardware failures during the 2010-2012 RPC system consists of: • 942 chambers + 144 (2014 upgrade) • 3434 gas gaps • 300 K electronics channels • 7.5 K HV connectors • 4 K gas connection (T or L shape) • 16 K gas inlet • HV/LV failures: • 12 out of 942 (1.3%) chambers where OFF at the end of 2012 • 43 single gap mode chambers • All repaired during the long shut-down (2013-2014) • Gas Leaks: T and inlet connection fragility • 16 leaky chambers have been found in half barrel - 8 have been successfully repaired • Endcap (no T connection) is ok – no leak • T connection is the most delicate components. Total failure of 0.4% • New gas C2H2F4-less R&D mandatory Distribution board and Threshold setting: about 1 % of channels have been masked for THR. An improved version of the distribution board has been installed in the 14 “broken” chambers (3.8%)

  4. CMS basic parameters

More Related