1 / 14

LLIN manufacture and supply to large scale public health campaigns, from a manufacturing perspective 12.10.2010 APPMG W

Key bottlenecks - procedural . Lack of forecasting is a hindranceTransferring approved funding in-country has elongated the procurement and contract award process Shifts in demand, leading to bottlenecks in production Lack of communication/information at the country level leads to uncertainty in

idra
Download Presentation

LLIN manufacture and supply to large scale public health campaigns, from a manufacturing perspective 12.10.2010 APPMG W

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    More Related