An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALKA ENGINEERING WORKS JAN-2012

  2. TEAM MEMBER:- • Mr. SANJAY PATIL • Mr. WARPE DEEPAK • Mr. V.B. BHAGWAT • Mr. SANTOSH PATIL • Mr. UDAY CHAVAN . Mr. MORE VISHNU • Mr. GHATAGE D.B .

  3. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- HEAD LUB 541 & 432 Ready for dispatch qty 85 nos. not lifted Ready for dispatch qty 80 nos. not lifted

  4. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- KOEL CRANK CASE

  5. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- KOMATSU COVER Ready for dispatch qty 286 nos Ready for dispatch qty 160 nos

  6. PART NAME :-FRONT SUPPORT ENGINE PART NO 3686801 COMPARATIVE PRODUCTION STATUS Casting shortage Ready for Dispatch Qty 704 nos

  7. COMPARATIVE PRODUCTION STATUS OF OTHER M/C PART PART NAME;- FRONT AXEL SUPPORT,FLY WHEEL,MANI FOlD,CONNECTING ROD H.L.COVER Note:- To calculate labor cost take 35% overhead on Basic+DA

  8. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CRANK CASE Note:- To calculate labor cost take 35% overhead on Basic+DA

  9. COST DETAILS PART NAME & NUMBER:- Head Lub 541 / 432 Alsul mf oil 45 lit issue Ready for dispatch qty 80 nos

  10. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- F.E.SUPPORT Note:- To calculate labor cost take 35% overhead on Basic+DA

  11. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- KOMATSU HOUSING Ready for dispatch qty 238 nos Ready for dispatch qty 286 nos Note:- To calculate labor cost take 35% overhead on Basic+DA

  12. MACHINE UTILISATION IN % (VMC)

  13. MACHINE UTILISATION IN % (VMC)

  14. MACHINE UTILISATION IN % (VMC)

  15. Breakdown Details (Whole shop)

  16. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Crank Case ***ACTION ON MAJOR REJECTION CAUSES

  17. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Head Lub Oil Filter ***ACTION ON MAJOR REJECTION CAUSES

  18. REJECTION DETAILS(ITEMWISE IN %) Part Name:- FRONT SUPPORT ENGINE (3686801) Contractor Labor New operators ***ACTION ON MAJOR REJECTION CAUSES

  19. REJECTION DETAILS(ITEMWISE IN %) Part Name:- Komatsu Cover Contractor Labor New operators ***ACTION ON MAJOR REJECTION CAUSES

  20. OVERALL REJECTION (All Parts) ***ACTION ON MAJOR REJECTION CAUSES

  21. COST OF POOR QUALITY ***ACTION ON MAJOR REJECTION CAUSES

  22. PLANT EFFICIENCY VAPCO = SALE VALUE - VARIABLE COST / TOTAL EMPLOYEE COST SALE VALUE =3860121 VARIABLE COST =1642895 TOTAL EMPLOYEE COST =966499 VAPCO =2.3