1 / 12

Survey Results

Survey Results. MAPA Summary of February 2010 Survey. Feedback through Surveys. A second MAPA survey was administered in February 2010 to DoDEA assistant principals, principals, assistant superintendents, and superintendents Approximately six months into implementation

ilario
Download Presentation

Survey Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Survey Results MAPA Summary of February 2010 Survey

  2. Feedback through Surveys A second MAPA survey was administered in February 2010 to DoDEA assistant principals, principals, assistant superintendents, and superintendents Approximately six months into implementation 244 respondents -- 65%response rate

  3. Survey… What you said!

  4. Survey… What you said!

  5. Survey… What you said!

  6. Survey… What you said!

  7. Survey… What you said!

  8. Survey… What you said!

  9. Survey… What you said!

  10. Next Steps MAPA Task Group • Answering the call for further professional development • Responding to the need to complete an entire cycle before collecting more data via a survey

  11. Next Steps Kaizen September- October, 2010 – administer surveyafter cycle has ended • Analyze results, strengths, and deficiencies September– October 2010 - evaluate E-MAPA (automated, paperless application pilot) • Determine improvements needed • Complete and test changes • Determine capability for DoDEA-wide implementation • Implement throughout DoDEA

  12. Next Steps Kaizen September– October 2010 – administer surveyafter cycle has ended September– October 2010 -- evaluateE-MAPA

More Related