Injection / Withdrawal Transmission Cost Allocation Updated Slides

Injection / Withdrawal Transmission Cost Allocation Updated Slides. OMS CARP Group November 19, 2009. Current Att. O Transmission Revenue Requirements by Pricing Zone and Voltage Level. Replacement for Slide 87.

iliana
Download Presentation

Injection / Withdrawal Transmission Cost Allocation Updated Slides

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Injection / WithdrawalTransmission Cost AllocationUpdated Slides OMS CARP Group November 19, 2009

  2. Current Att. O Transmission Revenue Requirementsby Pricing Zone and Voltage Level Replacement for Slide 87 Source: FERC Docket ER07-1233 filed August 1, 2007, except for MEC and MPW who were not members at this date. MEC submitted the stated percents and MPW assumed to have similar break-down as CWLP and CWLD. ATC has also submitted updated percentages. Note: 2009 Att. O Revenue Requirements includes Account 456.1 External Transaction Revenue

  3. Scenario 4: Engineering Analysis Scenario

  4. Difference in Load and Generation Charges by Pricing ZoneScenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 108

  5. Difference in Total Charges to Load by Pricing Zone Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 109

  6. Difference in Total Charges to Load by State Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 110

  7. $/MWh Difference in Total Charges to Load by Pricing Zone Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 111

  8. $/MWh Difference in Total Charges to Load by State Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 112

  9. Estimated State Percentage Retail Rate Impact Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 113