Injection / Withdrawal Transmission Cost Allocation Updated Slides. OMS CARP Group November 19, 2009. Current Att. O Transmission Revenue Requirements by Pricing Zone and Voltage Level. Replacement for Slide 87.
E N D
Injection / WithdrawalTransmission Cost AllocationUpdated Slides OMS CARP Group November 19, 2009
Current Att. O Transmission Revenue Requirementsby Pricing Zone and Voltage Level Replacement for Slide 87 Source: FERC Docket ER07-1233 filed August 1, 2007, except for MEC and MPW who were not members at this date. MEC submitted the stated percents and MPW assumed to have similar break-down as CWLP and CWLD. ATC has also submitted updated percentages. Note: 2009 Att. O Revenue Requirements includes Account 456.1 External Transaction Revenue
Difference in Load and Generation Charges by Pricing ZoneScenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 108
Difference in Total Charges to Load by Pricing Zone Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 109
Difference in Total Charges to Load by State Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 110
$/MWh Difference in Total Charges to Load by Pricing Zone Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 111
$/MWh Difference in Total Charges to Load by State Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 112
Estimated State Percentage Retail Rate Impact Scenario 4: Engineering Analysis for All Revenue vs. Scenario 1: Engineering Analysis except Att. O Local Replacement for Slide 113