Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008

Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008. Integration close Safe operation OK Grounding Tolerable Firmware Needs to be tested Luminosity After HF Software Started but lots to do

imala
Download Presentation

Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20 th September 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of ZDC Yasa & Michael for ZDC group, KU, Iowa, UIC 20th September 2008 • Integration close • Safe operation OK • Grounding Tolerable • Firmware Needs to be tested • Luminosity After HF • Software Started but lots to do • Lift fixture Working on final design

  2. DSS DCS HiVolt LoVolt S4F02 Integration HV GT signal LVDS Vertex 0.1 0.9 141ns - Laser QIE CCM RBX manager ZDC S2E13 S2C07 Tunnel RecHits LUT DQM Map HTR DCC S2F18 Lumi Server LHC Timing E+,E- HLX GCT S1E04 S2F07

  3. Safe Operation • After “technical inspection” in August we have covered all action items except for “High Voltage” signs in tunnel. • In addition we will install a safety ground between ZDC and TAN based on zener diodes. This will be done during shutdown. • Alain Cordonnier has installed DSS interlocks for low and high voltage. • Michael has submitted some procedures to Archana • Cables have official numbers that are listed in database

  4. Grounding • Layout was designed to minimize radiation load • Signal and HV cables connect S2E13 and tunnel • We had a “coffee meeting” with Laza, Magnus et al • Magnus would prefer that we not get HV and LV from S24F02 but rather keep everything at S2E13 • We would like to work on this over the winter shutdown. In the meantime Michael can write a simple procedure for disconnecting the ZDC if it is thought to be contaminating other detectors.

  5. Firmware • Drew Barden and John Jones have written firmware to great E+, E-, Multiplicity+ - and coincidence of + and - for Lumi • This still needs to be tested. • We still need LUTs to linearize ZDC based on parameters used in test beam. • Michael has started talking with Greg Landsberg and Gena Kukartsev and will try to finish this week

  6. Luminosity • ZDC E+ and E- should now be available to server. • Testing can start once Lumi group feels that the rest of the system is under control • Oleg Grachov will work with Princeton group on this when he comes in October. • ZDC, like HF, will be incorporated into lumi function manager so that it can be continuously providing lumi data.

  7. Software • From Cruzet4 Mayda, Steve found significant noise ~ 1-2GeV on pedestal. This is comparable to that seen in test beam. It is not from splitter box but probably from pickup on 208m of cable. • For beam splash events near ZDC, 10m!, was saturated but far one 290m from collimator saw nothing. • Urgent need now to set timing of ZDC wrt beam clock • We could start with dead reckoning and also look on scope. • Jason StJohn setting up ZDC DQM framework, Alexi Mestvirishvili will be looking at data • We are requesting that raw data also be stored offline • We need help on defining offline packages to make ZDC physics objects.

  8. Lift Fixture • Paul Debbins is finalizing design. We hope to have make a presentation to Austin & TS group early October. • We will also have to lift out BRAN. • Sarchophagus will be mostly marble. • Aiming to have this in for February.