An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Management Control Activity - Government Furnished Material Ready. Resourceful. Responsive!

  2. AGENDA • Policy • Directives • Procedures • Reports • Fraud, Waste and Abuse

  3. DON Policy • Contractors shall provide all material required for the performance of contracts • Exception when it is determined by DON that to furnish such material would • achieve significant economy • standardization • expedited production • or when it is otherwise in the government’s best interest

  4. DON Policy (cont) • Decision to provide a readily available commercial item as GFM requires • detailed analysis • written justification approved by the commander of the requiring activity, or a designated representative, as being in the best interest of the government

  5. DON Policy (cont) • All requisitions for GFM will be validated by the MCA • Any requisitions not validated will not be filled • Two types of GFM Requisitions • GFM “Push” • Generated by the government • Preferred method of providing GFM

  6. DON Policy (cont) • GFM “Pull” • Generated by the contractor • Will not be utilized unless demonstrated to be a clear advantage to the Navy

  7. Directives • DOD 4000.25-1-M • DOD 4140.1-R • OPNAVINST 4440.26 • SECNAVINST 4440.32A • SECNAVINST 5200.35D • NAVSEAINST 4440.1 • NAVAIRINST 4440 • NAVICPINST 4340.2C

  8. Procedure • NAVICP will perform two distinct categories of GFM functions • As an Inventory Control Point • Will generate “push” requisitions validated by the program manager • As a MCA • Will validate MILSTRIP requisitions generated internally

  9. Procedure (cont) • Will validate MILSTRIP requisitions generated by the contractor • Will forward passing orders to other services

  10. Reports • NAVICP produces and distributes quarterly reports of NAVICP processed GFM requisitions to CAOs

  11. Fraud, Waste, and Abuse • NAVICP investigates suspicious GFM requisitions for possible fraud, waste and abuse and take appropriate action