1 / 5

Lunar Orbit Circularization Toy Ball Materials Lunar Access with Ground Tracking

Lunar Orbit Circularization Toy Ball Materials Lunar Access with Ground Tracking. February 26, 2009. Impulse Thrust. Chart shows only boost in first orbit Δ v without boost is 0.38 m/s Isp = 280 s Mass of OTV=600 kg Launch Cost/kg=$ 4292 Cost’s are additional. TOF= Time of Flight.

ince
Download Presentation

Lunar Orbit Circularization Toy Ball Materials Lunar Access with Ground Tracking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lunar Orbit CircularizationToy Ball MaterialsLunar Access with Ground Tracking February 26, 2009 [Kara Akgulian] [Mission Ops]

  2. Impulse Thrust • Chart shows only boost in first orbit • Δv without boost is 0.38 m/s • Isp= 280 s • Mass of OTV=600 kg • Launch Cost/kg=$4292 • Cost’s are additional TOF= Time of Flight [Kara Akgulian] [Mission Ops] • Solid Only • Boost of: 10m/s,25m/s,50m/s,100m/s,200m/s • Split Between: 1st Orbit, 1st and 2nd Orbits and 1st, 2nd and 3rd Orbits • 3 Orbits: 1.) rp=1837.4 km ra=50000 km 2.) rp= 2737.4 km ra=525000 km 3.)rp= 2737.4 km ra=55000 km

  3. Continuous Burn • Assumptions: • Constant Thrust at Optimum Level • Working with Energy Equations • Optimum Pointing Angle • Costs are additional • Values Used: • EP Isp= 1800 s • Solid Isp= 280 s • Mass of OTV=600 kg • Launch Cost/kg=$4292 • EP Mass Flow Rate=5.6x10-6 kg/s • Solid mass Flow Rate=1.8 kg/s [Kara Akgulian] [Mission Ops] Electric Propulsion Solid Propulsion

  4. Backup Slides [Kara Akgulian] [Mission Ops] Δv split between the first two orbits

  5. [Kara Akgulian] [Mission Ops] Δv split between the first three orbits

More Related