DART Mission Assurance Process Map. Chief S&MA Officer. Mission Directorate Exploration Systems. Mission Directorate Space Operations. Explorers Program Office. KSC CD. MSFC CD. KSC SMA. 1. KSC LSPO. MSFC SMA. DART Project Office (J. Snoddy). LS SMA MAM (J. Roddy). 2.
E N D
DART Mission Assurance Process Map Chief S&MA Officer Mission Directorate Exploration Systems Mission Directorate Space Operations Explorers Program Office KSC CD MSFC CD KSC SMA 1 KSC LSPO MSFC SMA DART Project Office (J. Snoddy) LS SMA MAM (J. Roddy) 2 SFIA (D. Elliott) DART Contract (CPIF) SELVES Contract (FFP) LSP Eng Teams (J. Wood, B. Henry) VAFB - Range Safety - Ground Safety - Range LRR 4 Orbital Sciences Corp. LSG-DART DART SMA Mgr (M. Kennedy) Orbital Sciences Corp. LSG-Pegasus 3 5 S/W IV&V (P. Medley) Pegasus L10-11 VAFB INT & OPS DART 10 7 8 9 6 FAA -- L1011 Airworthiness -- Public Safety OSC TSD Quality Assurance KSC LS SMA Quality Mgr (K. Monette) Safety Mgr (H. Schultz) KSC LSP Mission Int. (Bellinger) Res. Office (Westoff) OSC S/W Assur. OSC LSG Qual,Safety&Rel Assurance KSC LS SMA 1 SMA (T. Arrigo) MSFC SMA Test Engr (Kalia) 11 15 12 13 14 Vehicle ARPO AVGS Matrix-ed relationship Direct report relationship Information flow Independent MA activity In-line MA activity 18 21 16 20 17 19 MSFC SMA DART S/W Assurance (Mitchell) MSFC DART SMA Qual Insp (Blair) MSFC DART SMA Qual Assur (Rains) DART SMA Qual Eng (Pierce) MSFC SMA DART S/W Assurance (Mitchell)
*** Mission Phases: • 1. Procurement, 2. Design (HW & SW), 3. Payload Manufacture, 4. Payload Systems test, 5. S/C integration to LV, 6. LV integration, 7. System test and Simulated flight, 8. Pre-launch Ops, 9. Launch ops, 10. Post-launch ops.