670 likes | 835 Views
G. E. M. A. Georgia Emergency Management Agency Office of Homeland Security. Public Assistance Applicant Briefing. FEMA-DR-1973-GA. Public Assistance Declared Counties. Bartow Catoosa Cherokee Coweta- A&B only Dade Floyd Gordon Greene Harris Heard
E N D
G E M A Georgia Emergency Management Agency Office of Homeland Security Public Assistance Applicant Briefing FEMA-DR-1973-GA
Public Assistance Declared Counties • Bartow • Catoosa • Cherokee • Coweta-A&B only • Dade • Floyd • Gordon • Greene • Harris • Heard • Jasper • Lamar • Lumpkin • Meriwether • Monroe • Morgan • Newton • Pickens • Polk- A&B only • Rabun • Spalding • Troup • Walker • White
1. 2. 3. Disaster strikes PDA Declaration 6. 5. 4. Req. FEMA Kickoff Meeting Request Applicants’ Briefing 8a. Small projectsvalidated 7. 10. 9. 8b. Large projects begun Applicant may formulate small projects. PO, Applicant, and State formulate large projects Projectcloseout Projects funded The Public Assistance Program
Facility Applicant Work Factors of Eligibility ELIGIBILITY Cost
Facility Eligibility Requirements • Damaged as a result of a declared event • Located within an area declared by the President • The legal responsibility of an eligible Applicant • In active use at the time of the disaster • Not under the authority of another federal agency
Request for Public Assistance List Sites Document Damage Review PWs Project Management Prepare Reports Inspections / Audit Primary Point of Contact The Applicant’s Agent Responsibility
Purpose of Kickoff Meeting • Introduce Applicant and PAC • Explain PA process, forms, and timelines • Discuss Applicant damages • Assess Applicant needs • Answer Applicant questions
PROJECT WORKSHEET (PW) • Determines Scopes of Works and Costs to Replace / Restore Publicly Owned Facilities • PW Teams composed of State, and Local (Applicant) Representatives
Role of Local Government in the PW Process • Facility / Location • Identify Damage / Cause • SCOPE OF WORK • Estimate of EligibleWork
Project Worksheet • Scope of Eligible Work • Most important part of the PW • Specific damage to the facility and proposed repairs must be described in quantitative terms
Project Worksheet FEMA/GEMA/Local - should agree on the scope of work and estimated cost
Eligible Work • Damage must be acquired as a direct result of the declared event • Damage must be within designated disaster area • Responsibility of the Applicant
Three general types of work: • Debris Removal - Category A • Emergency Protective Measures -Category B • Permanent Restoration - Categories C - G
Emergency Work • Debris Removal • Emergency Protective Measures
Debris Removal • Eliminate immediate threat to life, health and safety • Eliminate immediate threat to improved property • Ensure economic recovery of the community and provide a benefit for the community-at-large
Emergency Protective Measures Category B Activities undertaken by a community before, during, and following a disaster to save lives, protect pubic health and safety, and protect improved public and private property
Permanent Work • Road and Bridge Systems • Water Control Facilities • Public Buildings/Equipment • Public Utilities • Other (Parks, Recreation)
Roads and Bridges Category C Repair/Replacement of roads, bridges, culverts, etc. NOTE:Federal- Aid Roads, streets, and highways are ineligible
Water Control Facilities Category D • Includes repair or replacement of: • Dams • Levees • Drainage Channels • Shore Protective Devices • Pumping Facilities
Buildings and Equipment Category E Includes: • Buildings / Contents • Equipment (all types including vehicles) • Less any insurance
Utilities Category F • Repair / Replace disaster related damage to predisaster function • Increases in operating expenses, even if they are a result of the disaster, are not eligible
Parks, Recreational and Other Category G • Buildings, roads, utilities, etc. located in parks or in similar areas • Playground equipment, swimming pools, tennis courts, etc. are also eligible • Structured beaches that meet a certain criteria are eligible
LIBRARY LIBRARY L IB RAR Y Eligible Permanent Work • Repair, restore or replace damaged facilities in accordance with regulations • Restore to pre-disaster design, capacity and function in accordance with applicable codes and standards • The work must be required as a result of the disaster • May include cost effective hazard mitigation measures
Reasonable and necessary cost to accomplish eligible work Complies with federal, state, and local laws and regulations Insurance proceeds, salvage value, and purchase discounts must be deducted General Cost Eligibility
Special Considerations Hazard Mitigation Environmental Requirements Historic Preservation & Cultural Resources Special Flood Hazard Areas Insurance Requirements
Insurance Considerations • Anticipated coverage is subtracted from PA funding • No duplication • Must be obtained and maintained • On insurable facilities for which PA funding has been provided • Projects less than $5,000 exempt • Self-insurance • State Only for PA purposes • Insurance Requirements Waiver • State Insurance Commissioner certification required if not reasonably available
Insurance Considerations Applicant Actions • Identify insurable facilities • Type and amount of coverage • Deductibles and policy limits • Identify facilities that previously received PA • Provide pertinent information • Policies • Declarations • "Statements of Loss“ • Pursue payment under insurance policies
Environmental: Debris Site Information • Name of Debris Site • Location (Lat/Long (preferred), address) • Type (i.e. temporary storage, grinding, burn, landfill, etc.) Documentation • Permanent sites and Permit number • Landfill Permits • For temporary sites: proof the applicant has contacted GA DNR and received field authorization (letter or e-mail) Failure to provide information may delay disbursement of funds.
Environmental: Historic • Need to know year built (all structures), regardless of age • Structures > 49 years of age require additional review • In coordination with the State Historic Preservation Office (SHPO) • Proposed disturbance of previously undisturbed ground
Environmental: Other • Does project affect (but not limited to): • Endangered Species • Wetlands • Floodplains • Waters of the United States • Coastal Barrier Resource Units • Low Income or Minority Populations
Consequences of Non-Compliance • Loss of funding • Delays • Legal issues • Negative publicity
What is Project Formulation? • Scope of Work and Cost Estimates • Combining Sites Into Projects • Sorting Projects Into Small and Large Projects • Note Special Consideration
Who Identifies the Issues? • Applicant responsibility • PAC • Specialist
Documentation is establishing and maintaining records. The Public Assistance Program Doc-43
Documentation Document! Document!! Document!!! • Existing systems may be sufficient • Maintain records at least three (3) years after closeout!
Documentation Remember . . . Undocumented eligible expenses WILL NOT be reimbursed!
Force Account Labor Summary Record Rented Equipment Summary Record Material Summary Record Force Account Equipment Summary Record Summary Records
Force Account Labor • Overtime costs are only eligible (if it is an established policy to pay overtime) • If compensatory time is usually given to replace overtime, then that policy stands and OT is not eligible. • Fringe benefit rates are eligible for reimbursement (normally regular rates and OT rates are different) • Temporary hires are eligible for regular and overtime costs (must be used for disaster assistance only)
Force Account Equipment • Equipment is eligible for regular time and overtime • Standby time is ineligible • Hourly costs for trucks, back-hoes, etc. • Mileage costs for automobiles, crew cabs, etc. • Must use FEMA cost codes or your own costs codes, whichever is less
Materials • Material costs are eligible • Keep invoices and/or purchase orders • Keep all canceled checks • Keep record of any inventory used from stock • Maintenance or up-keep items (ie. Oil, gasoline) are not eligible
Mutual Aid • Must have contractual agreement between both parties IN WRITING! • Must be reasonable costs • Agency providing the assistance must submit bill to applicant • Damage assessment costs are ineligible • Regular and overtime costs are eligible
Contracts and Procurement • Reasonable Cost • Competitively Bid • Must Comply With Standards • Federal (44CFR Part 13) • State (as applicable) • Local (own adopted code/policy)